Forms & guides › Township of King
King 2026 Fees and Charges
King 2026 Fees and Charges is a fee schedule from the Township of King (Building Division - King). Township fees effective 5 January 2026 for building, planning, development engineering, pools, signs, Clerks, Public Works and fire services, excluding HST unless marked.
Township of King · Building Division - King · Fee schedule
Which permits is it used for?
- Building Permit: New House, Addition or Secondary Suite (King)
- Building Permit: Garage, Shed, Deck, Porch or Cabana (King)
- Building Permit: Small Building or Farm Building, Part 9 (King)
- Building Permit: Large Building, Part 3 (King)
- Building Permit: Complex Building, High-rise or High-hazard (King)
- Building Permit: Interior Alteration, Renovation or Tenant Fit-up (King)
- Demolition Permit: House or Part 9 Residential Building (King)
- Demolition Permit: Non-residential or Part 3 Building (King)
- Conditional or Partial Building Permit (King)
- Change of Use Permit (King)
- Occupancy Permit (King)
- Model Certification (King)
- Sewage System (Septic) Permit (King)
- Plumbing and Site Services Permit: Water or Sewer Connection and Septic Decommissioning (King)
- Mechanical (HVAC) and Solid Fuel Appliance Permit (King)
- Fire Protection Systems Permit: Sprinklers or Fire Alarm (King)
- Designated Structure Permit: Retaining Wall, Shoring, Solar, Tower or Storage Tank (King)
- Temporary Tent or Structure Permit (King)
- Building Permit: Sign Structure Regulated by the Building Code (King)
- Alternative Solution Authorization (King)
- Building Permit Revision, Transfer or Extension (King)
- Development Engineering Approval: Lot Grading and Servicing for a Building Permit (King)
- Pool Permit and Pool Enclosure (King)
- Site Alteration and Fill Permit (King)
- Hard Landscaping Exemption Permit (King)
- Road Occupancy Permit, including Construction Parking and Bins (King)
- Road Closure Permit (King)
- Municipal Consent for Utility Work (King)
- Entrance Permit: New or Altered Driveway Entrance (King)
- Half Load Exemption (King)
- Hydrant Meter Permit and Hydrant Flow Test (King)
- Site Plan Approval (King)
- Zoning By-law Amendment (King)
- Official Plan Amendment (King)
- Draft Plan of Subdivision (King)
- Draft Plan of Condominium (King)
- Part Lot Control Exemption (King)
- Removal of Holding (H) Symbol (King)
- Temporary Use By-law (King)
- Minor Variance (King)
- Consent to Sever, Easement or Lot Addition (King)
- Zoning Certificate (King)
- Municipal Address Assignment (King)
- Sign Permit: Permanent Sign (King)
- Temporary Sign Permit (King)
- Sign By-law Variance (King)
- Noise Exemption Permit (King)
- Large-Scale Event on Private Property Permit (King)
- Film Permit (King)
- Road Occupancy Permit for Special Events (King)
- Temporary Patio Permit and Extended Patio Program (King)
- Open Air Burning Permit (King)
- Fireworks Display Permit: Consumer or Professional (King)
- Fire Inspection: Commercial, Industrial, Multi-unit or Institutional (King)
- Committee of Adjustment Zoning Review and Pre-Consultation (King)
Track the permit this form is for free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.