Permit Library › Other GTA municipalities › Township of King › Building permits (Building Division)
Sewage System (Septic) Permit (King)
Sewage system permit from the King Building Division for a new or repaired on-site septic system, under Building By-law 2025-068 section 3.2.5 and the Building Code [king.ca].
You need it when: You install a new septic system, or repair or replace one, on a property in King.
Why is it needed?
- Building By-law 2025-068 makes the sewage system permit one of the Township's permit types [king.ca].
- The Township also runs a Sewage System Maintenance Inspection Program under Part 12 of the by-law [king.ca].
When should you apply?
- Permits or written approvals from other authorities, such as road cuts, a conservation authority or site servicing, must be in place before the permit is issued [king.ca].
- Fees, development charges and security deposits are paid before the permit is issued [king.ca].
- Where you also build a house, its Development Engineering Approval submission shows the septic and well locations and comes before the building permit [king.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Provincial application form for a sewage system permit [king.ca]
- Site evaluation on a scaled map: legal description, the Building Code Table 8.2.1.6 items, proposed and existing systems, wells on your lot and adjacent lots, and disturbed areas [king.ca]
- Depth to bedrock and to high groundwater, soil properties and permeability, and flooding potential [king.ca]
- Percolation or grain-size test results and a cross-section of the system [king.ca]
- Sewage System Evaluation Declaration [king.ca]
How do you submit it?
- Use the On-Site Sewage System Application Package on the Township's Forms & Applications page and apply to the Building Division on the CityView Portal at cityview.king.ca/Portal [king.ca].
What are the fees?
2026 fees: new sewage system $1,705.00, sewage system repair $341.00 (2026 Fees and Charges, effective January 5, 2026) [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)
Official pages
Track Sewage System (Septic) Permit (King) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.