Forms & guides › Township of King
King Building By-law 2025-068
King Building By-law 2025-068 is a by-law from the Township of King (Building Division - King). The Building By-law passed 10 Nov 2025 and in force 1 Dec 2025, replacing By-law 2021-060: construction, demolition, conditional, change of use, sewage system and transfer applications, completeness rules, abandonment after six months, refunds, revocation and inspection notices.
Township of King · Building Division - King · By-law
Which permits is it used for?
- Building Permit: New House, Addition or Secondary Suite (King)
- Building Permit: Garage, Shed, Deck, Porch or Cabana (King)
- Building Permit: Small Building or Farm Building, Part 9 (King)
- Building Permit: Large Building, Part 3 (King)
- Building Permit: Complex Building, High-rise or High-hazard (King)
- Building Permit: Interior Alteration, Renovation or Tenant Fit-up (King)
- Demolition Permit: House or Part 9 Residential Building (King)
- Demolition Permit: Non-residential or Part 3 Building (King)
- Conditional or Partial Building Permit (King)
- Change of Use Permit (King)
- Occupancy Permit (King)
- Model Certification (King)
- Sewage System (Septic) Permit (King)
- Plumbing and Site Services Permit: Water or Sewer Connection and Septic Decommissioning (King)
- Mechanical (HVAC) and Solid Fuel Appliance Permit (King)
- Fire Protection Systems Permit: Sprinklers or Fire Alarm (King)
- Designated Structure Permit: Retaining Wall, Shoring, Solar, Tower or Storage Tank (King)
- Temporary Tent or Structure Permit (King)
- Building Permit: Sign Structure Regulated by the Building Code (King)
- Alternative Solution Authorization (King)
- Building Permit Revision, Transfer or Extension (King)
Track the permit this form is for free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.