Permit Library › Other GTA municipalities › Township of King › Building permits (Building Division)
Fire Protection Systems Permit: Sprinklers or Fire Alarm (King)
Building permit from the King Building Division for fire alarm and sprinkler systems, under Building By-law 2025-068 and the Ontario Building Code [king.ca].
You need it when: Work in a King non-residential building installs or changes a fire alarm or sprinkler system.
Why is it needed?
- The Township's 2026 Fees and Charges set a permit fee for non-residential fire alarm or sprinkler work [king.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Permits or written approvals from other authorities, such as road cuts, a conservation authority or site servicing, must be in place before the permit is issued [king.ca].
- Where the Building Code requires an architect's or engineer's general review, the undertaking goes in with the application [king.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Provincial Application for a Permit to Construct or Demolish [king.ca]
- Complete plans and specifications as the Building Code requires [king.ca]
- Commitment to General Review form, where general review applies [king.ca]
- Letter of Authorization, if required [king.ca]
How do you submit it?
- Apply to the Building Division on the CityView Portal at cityview.king.ca/Portal [king.ca].
What are the fees?
2026 fee: $681.00 per storey for non-residential fire alarm or sprinkler work (2026 Fees and Charges, effective January 5, 2026) [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)
Official pages
Track Fire Protection Systems Permit: Sprinklers or Fire Alarm (King) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.