Permit Library › Other GTA municipalities › Township of King › Building permits (Building Division)
Mechanical (HVAC) and Solid Fuel Appliance Permit (King)
Building permit from the King Building Division for mechanical (HVAC) work, solid-fuel appliances and geothermal systems, under Building By-law 2025-068 and the Building Code [king.ca].
You need it when: You install or replace heating, ventilation or air conditioning, a fireplace, woodstove or other solid-fuel appliance or a geothermal system, or change a fuel source, in King.
Why is it needed?
- The Township's Building Permits page lists solid-fuel appliances and changes of fuel source as work that needs a building permit [king.ca].
- The 2026 Fees and Charges set permit fees for residential HVAC, fireplaces or woodstoves and geothermal systems [king.ca].
When should you apply?
- Permits or written approvals from other authorities, such as road cuts, a conservation authority or site servicing, must be in place before the permit is issued [king.ca].
- Give notice for each required inspection, which counts only once you get a Township confirmation number [king.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Provincial Application for a Permit to Construct or Demolish [king.ca]
- Complete plans and specifications as the Building Code requires [king.ca]
- Qualified designer information form [king.ca]
- Letter of Authorization, if required [king.ca]
How do you submit it?
- Apply to the Building Division on the CityView Portal at cityview.king.ca/Portal [king.ca].
What are the fees?
2026 fees: residential HVAC $455.00, fireplace or woodstove $455.00, geothermal $568.00 for one dwelling or $796.00 otherwise (2026 Fees and Charges, effective January 5, 2026) [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)
Official pages
Track Mechanical (HVAC) and Solid Fuel Appliance Permit (King) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.