Permit Library › Other GTA municipalities › Township of King › Building permits (Building Division)
Building Permit: Interior Alteration, Renovation or Tenant Fit-up (King)
Building permit under King Building By-law 2025-068 for an interior alteration, renovation or tenant fit-up, issued by the Building Division [king.ca].
You need it when: You renovate or alter the inside of a home, or fit up a tenant space, in the Township of King.
Why is it needed?
- The Building Permits page lists plumbing work, solid-fuel appliances and fuel-source changes as work that needs a building permit [king.ca].
- The Township publishes an Interior Alteration Application Guide for residential work [king.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Permits or written approvals for road cuts, culverts, driveway entrances, conservation authority, site servicing and other applicable law must be in place before the permit is issued [king.ca].
- Construction must start within 6 months of issuance, or the permit may be void or need a written extension [king.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (provincial form) [king.ca]
- Drawings and details listed in the Interior Alteration Application Guide [king.ca]
- Qualified designer form [king.ca]
- Letter of authorization, if required [king.ca]
How do you submit it?
- Apply to the Building Division on the Township's CityView Portal at cityview.king.ca/Portal [king.ca].
What are the fees?
2026 fees: interior or exterior alterations $8.00 per m2 (minimum $400), Groups A and B fit-out $8.00 per m2 (minimum $400) and finished basement $8.00 per m2 (minimum $400) [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)
Official pages
Track Building Permit: Interior Alteration, Renovation or Tenant Fit-up (King) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.