Permit Library › Other GTA municipalities › Township of King › Building permits (Building Division)
Change of Use Permit (King)
Change of use permit under Building Code Act section 10 and King Building By-law 2025-068 for a new use of all or part of a building, issued by the Building Division [king.ca].
You need it when: You change the use of all or part of a building in the Township of King, even if no construction is planned.
Why is it needed?
- Building By-law 2025-068 sets a separate application for a change of use permit [king.ca].
- The application needs a Change of Use justification report with floor plans, assembly fire-resistance ratings and load capacity, and existing sewage system details [king.ca].
When should you apply?
- Confirm zoning first, because the application is not processed until zoning and other applicable law are confirmed [king.ca].
- Permits or written approvals for road cuts, culverts, driveway entrances, conservation authority, site servicing and other applicable law must be in place before the permit is issued [king.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Change of use application form, signed, with the owner's name and address [king.ca]
- Change of Use justification report with floor plans [king.ca]
- Wall, ceiling and roof assembly details with fire-resistance ratings and load capacity [king.ca]
- Existing sewage system details [king.ca]
How do you submit it?
- Apply to the Building Division on the Township's CityView Portal at cityview.king.ca/Portal [king.ca].
- The Change of Use application package lists the forms [king.ca].
What are the fees?
2026 fee: change of use with no construction $681.00 [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)
Official pages
Track Change of Use Permit (King) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.