Designated Structure Permit: Retaining Wall, Shoring, Solar, Tower or Storage Tank (King)
Building permit from the King Building Division for designated structures such as retaining walls, shoring, solar systems, towers and storage tanks, under Building By-law 2025-068 [king.ca].
Why is it needed?
- The Township's 2026 Fees and Charges list these structures with their own permit fees [king.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Permits or written approvals from other authorities, such as road cuts, a conservation authority or site servicing, must be in place before the permit is issued [king.ca].
- The Township names the TRCA and LSRCA among the other approvals a building permit may need [king.ca].
- Fees, development charges and security deposits are paid before the permit is issued [king.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Provincial Application for a Permit to Construct or Demolish [king.ca]
- Complete plans and specifications as the Building Code requires [king.ca]
- Site and grading plan with setbacks, grades and drainage, where the Township asks for one [king.ca]
- Commitment to General Review form, where general review applies [king.ca]
- Letter of Authorization, if required [king.ca]
How do you submit it?
- Apply to the Building Division on the CityView Portal at cityview.king.ca/Portal [king.ca].
What are the fees?
2026 fees: retaining wall $9.00 per linear m residential (minimum $400) or $12.00 per linear m non-residential (minimum $800), shoring $12.00 per linear m, solar PV or solar hot water $455.00, tower or wind turbine $711.00, storage tank $455.00, outdoor public pool $568.00 (2026 Fees and Charges, effective January 5, 2026) [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)