Building Permit: New House, Addition or Secondary Suite (King)
Building permit under King Building By-law 2025-068 for a new house, an addition, a finished basement or a secondary suite, issued by the Building Division [king.ca].
Why is it needed?
- Building By-law 2025-068 took effect on 1 Dec 2025 and sets what a complete construction permit application must include [king.ca].
- Building Code timelines do not start until the Township deems the application complete, including zoning, engineering and Public Works approvals [king.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Get a Zoning Certificate first, then Development Engineering Approval, then apply for the building permit [king.ca].
- If a minor variance is needed, the application is not complete until the variance decision is final and binding [king.ca].
- Once the foundation is done, a Foundation Control Certificate and topographic survey by an Ontario Land Surveyor must be approved before above-grade inspections [king.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (provincial form) [king.ca]
- Complete plans and specifications that follow the Electronic Building Permit Application Submission Standards [king.ca]
- Site and grading plan, with an Ontario Land Surveyor survey where required [king.ca]
- Approved Zoning Certificate and Development Engineering Approval [king.ca]
- Qualified designer form, and an architect or engineer general review undertaking where required [king.ca]
- Other documents or forms the Building Division asks for [king.ca]
How do you submit it?
- Apply to the Building Division on the Township's CityView Portal at cityview.king.ca/Portal [king.ca].
- Use the New Home and Additions application package from the Building Division [king.ca].
What are the fees?
2026 fees: new single, semi or townhouse $20.00 per m2 (minimum $3,000), residential addition $20.00 per m2 (minimum $1,000), secondary suite retrofit $11.00 per m2 (minimum $400), finished basement $8.00 per m2 (minimum $400) and below-grade entrance $455.00 [king.ca]. 2026 Zoning Certificate for a new house or addition: $132.00 [king.ca]. Development Engineering fees are collected with the building permit fees, with 2026 rates of $265 for a simple lot grading review and $454 for a lot grading inspection [king.ca].
Forms and guides
- King Building By-law 2025-068 (Township of King, by-law)
- King 2026 Fees and Charges (Township of King, fee schedule)
- King Application for Zoning Certificate (Township of King, application form)