Permit Library › Other GTA municipalities › Township of King › Development Engineering, grading, pools and site alteration
Development Engineering Approval: Lot Grading and Servicing for a Building Permit (King)
Development Engineering review of lot grading, drainage and servicing before a King building permit, under the Township Design Criteria Appendix 12 and Section M [king.ca].
You need it when: You are applying for a King building permit for a new house, an addition or an accessory building.
Why is it needed?
- Before applying for your building permit in King you are required to obtain a Development Engineering Approval [king.ca].
- Under Building By-law 2025-068, a permit application is not processed and review time does not start until zoning and grading approvals are confirmed [king.ca].
- Submissions follow the Township Design Criteria Appendix 12 and Section M, including drainage, roof leaders, erosion and sediment control and a 0.6 m (2 ft) undisturbed setback from all property lines [king.ca].
When should you apply?
- Get the Zoning Certificate approved first, then the Development Engineering Approval, then apply for the building permit [king.ca].
- If the hard landscaping breakdown is greater than 60%, a Hard Landscaping Exemption Permit is required [king.ca].
- If the engineering approval affects zoning, a new Zoning Certificate is needed [king.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Approved Zoning Certificate and the stamped drawings [king.ca]
- Lot grading drawing with existing and proposed topographic survey and drainage patterns [king.ca]
- Hard landscaping breakdown [king.ca]
- Storm Water Brief, for lots inside a village boundary [king.ca]
- Servicing details: inverts, water service size and septic or well location [king.ca]
- Checklist GMS-120 Development Engineering Review, for a new infill house [king.ca]
How do you submit it?
- For a new infill house, submit the completed GMS-120 checklist with the package, and incomplete submissions are returned to the applicant [king.ca].
- For additions and accessory buildings, email devengapproval@king.ca with the address and type of building permit in the subject line and attachments under 10MB in total [king.ca].
What are the fees?
Development Engineering fees are included in the building permit fees collected by the Building Division [king.ca]. 2026 fee: $265 for a simple lot grading review by Township staff and $454 for a lot grading inspection, simple or complex [king.ca]. A complex review is charged at actual cost plus an administration fee [king.ca].
Forms and guides
- King 2026 Fees and Charges (Township of King, fee schedule)
- King Application for Zoning Certificate (Township of King, application form)
Official pages
Track Development Engineering Approval: Lot Grading and Servicing for a Building Permit (King) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.