Permit Library › Other GTA municipalities › Township of King › Water, hydrants and service connections (Public Works)

Hydrant Meter Permit and Hydrant Flow Test (King)

A Public Works permit to draw water from a King hydrant through a Township meter and backflow preventer, under Water Use By-law 2014-73, with flow tests on FORM-PW-117 [king.ca].

You need it when: You need temporary bulk water from a Township hydrant in King, or a hydrant flow test.

Why is it needed?

When should you apply?

How long does review take?

No review time is published for this permit; ask the City when you apply.

What documents does a complete application need?

How do you submit it?

What are the fees?

2026 fees: hydrant rental $250.00/month, meter and backflow preventer installation and removal $300.00, a $5,000.00 deposit refunded minus costs incurred, and fire flow test $225.00 per hydrant (2026 Fees and Charges) [king.ca]. The Hydrant Meter Application 2026 adds backflow testing (installation only) $200.00 and bulk water $4.10/m³ [king.ca].

Forms and guides

Official pages

Track Hydrant Meter Permit and Hydrant Flow Test (King) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.