TRCA VPR: Bridges, Culverts and Other In-Water Works
Toronto and Region Conservation Authority (TRCA) · version October 31, 2021, Rev. 2.0
To be used together with the TRCA VPR General Submission Requirements Checklist and, if required, the Site Development, Grading and Earthworks Checklist, together with any comments previously submitted by TRCA specific to the project.
General submission requirements checklist
| 1 | All items listed within the TRCA VPR General Submission Requirements Checklist. |
Supporting documentation
| 2 | Delineation of all relevant natural feature and hazard limits and watercourses on the drawings. Contact TRCA staff for a preliminary screening of existing features. Additional work to refine and identify limits may be required, such as:
|
If the proposed work involves in-water work
| 3 | In addition to the General Checklist items, include in the Work Plan:
|
| 4 | Detail design drawings, signed and stamped by a licensed professional, showing:
|
| 5 | Include applicable TRCA Standard Notes on the drawings, including the standard flood contingency plan note and the appropriate construction timing window. |
| 6 | Hydrogeological report (Hydrogeological Assessment Submissions: Conservation Authority Guidelines for Development Applications) |
If the proposed work involves lining an existing culvert, or extending or replacing an existing culvert or bridge
| 7 | All requirements identified under "in-water work" above |
| 8 | Detail design drawings (plan and profile), signed and stamped by a licensed professional, showing:
|
| 9 | Hydraulic Assessment of the existing and proposed structure to confirm the proposed structure will not result in increased flood hazards, including:
|
| 10 | Natural Heritage Study by a qualified ecologist/biologist to confirm existing site conditions/past studies; assess potential impacts of development, construction methods and access; and demonstrate that impacts have been minimized to the extent feasible. Define the scope in consultation with TRCA staff. |
| 11 | Geotechnical report with recommendations to support the proposed design, assessment of slope stability, and mitigation measures to protect against the risk of erosion hazards and slope instability |
| 12 | If there are any changes to the size and configuration of the culvert or bridge from the EA, a Fluvial Geomorphologic study may be required. |
If the proposed work involves watercourse modification or re-alignment
| 13 | All requirements identified under "in-water work" above |
| 14 | Design Brief, including:
|
| 15 | Detail design drawings (plan and profile), signed and stamped by a licensed professional, showing:
|
| 16 | Fluvial Geomorphologic Study, including existing channel characteristics and proposed channel alteration characteristics |
| 17 | Hydraulic Analysis, including:
|
| 18 | Natural Heritage Study by a qualified ecologist/biologist (as above). Define the scope in consultation with TRCA staff. |
| 19 | Erosion and Sediment Control report and drawings, also including:
|
| 20 | Post Construction Monitoring Plan for channel stability, aquatic and terrestrial habitat, etc. |
Notes
| 21 | No fees associated with VPR submission |
| 22 | Contact TRCA staff for a screening of site features/hazards |
| 23 | Obtain relevant computational modelling, mapping layers and data through a TRCA Data Request (modelling requests may take additional time). Relevant feature and hazard limits and the TRCA Regulated Limit should be included on the drawings. A completed and signed TRCA Data Disclaimer is required. |
| 24 | All TRCA guidance documents are available on the TRCA Planning and Permits website (trca.ca/planning-permits) |
| 25 | ESC Guide for Urban Construction and ESC Submission Checklist – Detailed Design: sustainabletechnologies.ca/home/erosion-and-sediment-control/esc-guide/ |
| 26 | Supporting TRCA VPR-related information in your project records should also be referenced. Additional TRCA checklists and guidelines are available on the TRCA website. Consultation with the TRCA Planner to confirm requirements at the time of application is strongly recommended. |