Occupancy of a Building: Authority to Occupy

City of Toronto: Toronto Building · version January 28, 2022, Rev. 02

Cover letter including

1Brief description of the area to be occupied
2Contents of the submission

Application forms

3Authority to Occupy Application Form

Fire alarm system / emergency voice system (required when applying to occupy a Part 3 building, after the inspector confirms the building is ready)

5Written confirmation from the installer that the system has been installed as per CAN/ULC-S524.
6Verification of partial fire alarm systems tested and documented as per CAN/ULC-S537 (no deficiencies, including smoke detector sensitivity data and an audibility report indicating ambient and alarm signal sound pressure levels throughout the floor area).
7Electrical Safety Authority certificate
8ULC Monitoring test documentation certificate.
9Copy of zones on Annunciation Panel
10Copy of Sequence of Operations – 2 Stage or interconnected with another building.
11Copy of specifications for detectors installed – Heat, Smoke, Air Duct Smoke, Combo Smoke/Carbon Alarms
12Fire Shutters – installer's certificate along with drop test documentation & sequence of operation procedures as per NFPA 80.
13Electrical Engineer's final letter with stamp (date and signature in stamp)

Sprinklers

15Contractor's Material and Test Certificates for above ground piping (supplied or IAO equivalent).
16Contractor's Material and Test Certificates for below ground piping (supplied or IAO equivalent).
17Fire pump manufacturer's certified pump shop test characteristic curve
18Results of a field acceptance test in conformance with NFPA-20 with the fire pump manufacturer present
19Sprinkler compliance letter as per NFPA 13 – 2007
20Dry sprinklers installed YES / NO
21If YES, Contractor's Material and Test Certificate including system capacity
22Copy of specifications of the different types of sprinkler heads installed.
23Window sprinklers installed YES / NO
24If YES, Contractor's Material and Test Certificate including system capacity (if a separate permit is required, provide an electrical engineer review letter.)
25Mechanical Engineer's final letter with stamp (date and signature in stamp).
26Mechanical Engineer's review letter for window sprinkler system.
27Backflow preventer test report.

Standpipe system

29Report to Toronto Building of test of Standpipe System
30Contractor's Material and Test Certificates for above ground piping (supplied or IAO equivalent)
31Contractor's Material and Test Certificates for below ground piping (supplied or IAO equivalent).
32Fire pump manufacturer's certified pump shop test characteristic curve.
33Results of a field acceptance test in conformance with NFPA 20 – 2010 with the fire pump manufacturer present.
34Installer's letter stating installation of Standpipe and Hose Systems as per NFPA 14 – 2010
35Installer's letter stating the system complies with 3.2.9 of the Ontario Building Code, and the result of the hydrostatic test of the completed system.
36Engineering report demonstrating the inlet and outlet pressures and the settings for listed devices to prevent residual pressure from exceeding 689 kPa (100 PSI) at all 38 mm hose valves. This information must also confirm all devices are appropriately set.
37Complete list of PRV settings including static pressure and residual pressure.
38Backflow preventer test report.
39Mechanical Engineer's final letter with stamp (date and signature in stamp).

Elevators, lifts, moving walks and escalators

41TSSA certificate
42Letter from elevator installer linking TSSA certificate # with elevator # as designated by Arch. Dwgs.

Emergency generator

44Installation and test documentation as per CAN/CSA C282-05
45Day tank – size and float setting for refill, including the mechanical engineer's letter on tank filling control.
46TSSA commissioning report for start of emergency generator operation.

Fire safety plan

48Fire Safety Plan as per Ontario Fire Code Section 2.8 – submit 2 copies to Toronto Fire Services prior to occupancy.

Maglock system

50Maglock devices installed YES / NO. If YES, then:
51System Engineer's review letter
52Installer's Declaration – Electromagnetic Locking Devices Form
53Written confirmation from installer that the system has been installed as per CAN/ULC-S524-06 if not in building version.
54Verification of partial fire alarm systems will be tested and documented as per CAN/ULC-S537-04 if not in building version.
55Electrical Safety Authority certificate

Pre-action system

57Pre-action system installed YES / NO. If YES, then:
58System Engineer's review letter
59System test certificate
60Written confirmation from installer that the system has been installed as per CAN/ULC-S524-06 if not in building version.
61Verification of partial fire alarm systems will be tested and documented as per CAN/ULC-S537-04 if not in building version.

Fire suppression system

63Fire suppression system installed YES / NO. If YES, then:
64System test certificate
65Written confirmation from installer that the system has been installed as per CAN/ULC-S524-06 if not in building version.
66Verification of partial fire alarm systems will be tested and documented as per CAN/ULC-S537-04 if not in building version.

Consultants' letters

67Consultants' letters including sign-off from all disciplines (Architect, Structural, Mechanical, Electrical Engineer). Refer to Attachment #1 (below) for items each discipline should take into consideration when signing off. Discuss sign-off reports with the inspector assigned to the file.

Attachment #1: documentation requirements for occupancy or partial occupancy (consultants' letters)

1Architect – including Barrier Free Suites
2Architect – fire-stopping and smoke seal methods for all applications
3Structural Engineer – shoring, footing, foundation, structure and geotechnical sign-offs
4Mechanical Engineer
5Electrical Engineer
6Life safety system commissioning letter as per OBC
7ESA certificate
8Elevator Company – clearance letter with reference to Cab # as per issued permit drawings and TSSA certificate.
9TSSA certificate for each elevator cab commissioned
10Railing Company – load requirements and test results, tempered glass/laminated, Engineer's letter with reference to 4.1.5.14 Loads on Guards Part 4 and 3.3.1.17 Guards Part 3 of the O.B.C.
11Window / Curtainwall Company – Engineer's letter stating load/impact requirements as per 4.1.5.14 Part 4 and 3.4.6.6, 3.3.1.18 Part 3 of the O.B.C.
12Rooftop Anchors – Structural Engineer
13Landscape Architect
14Surveyor final letter
15Interior Glass – tempered or laminated
16Green Roof – By-law 583-2009 – Architect or Engineer letter documenting a successful test
17Spray Foam Insulation – specs, installer's certificate and Engineer's sign-off letter
18Specification sheets for Flame Spread and Smoke Development of interior wall and ceiling finishes
19Record of site condition, if not already provided to the City, from the Ministry of the Environment
20Backflow preventer test report for domestic water main line
21Foundation Survey, if not already provided

Notes

69All documents, certificates, letters and calculations must reference the permit number and permit address, and can include the convenience address if applicable.
70All documents, certificates, letters, calculations, etc. are to bear ink or electronic original signatures, and the name of the person signing shall be legible, printed or typed below the signature. Unless stated otherwise, all documents shall be stamped, signed, sealed and dated.
71Documentation is to be on the prescribed forms supplied or, where a form is not prescribed, on the letterhead of the contractor.
72Only original documents are acceptable. Photocopies or facsimile-reproduced documents will not be accepted.
73Documents, certificates, letters, calculations, etc. shall not contain vague or qualifying words or phrases such as: to the best of our knowledge, appears to be, in reasonable compliance with, assumed, etc.
74All prescribed forms are to reference the most recent edition referenced in the Ontario Building Code.
75All documents, certificates, letters, calculations, etc. shall be provided for review directly to the Building Inspector via email prior to field inspection/testing of the required fire system(s), and will be submitted electronically and itemized in a binder on site.
76A separate occupancy permit is required for each stage of occupancy. Before any part of an unfinished building can be occupied, the structure must meet the Ontario Building Code. Occupancy permit requirements are set out in Division C, Part 1, Article 1.3.3.1 of the Ontario Building Code.
77Requests for occupancy require a minimum of 10 business days' advance notice prior to inspection. Contact your area building inspector to make an appointment for an occupancy permit inspection.
78Fees: the occupancy permit fee covers the first five hours of inspection time. Additional time is charged hourly.

Submission requirements for building permit application are governed by Article 3 of Toronto Municipal Code, Chapter 363. This checklist identifies the scope of information typically required to support processing of this type of application in accordance with Chapter 363. Nevertheless, it is the responsibility of the applicant to consult with the approval authority prior to application submission to confirm the submission requirements for more complex applications. This checklist is not intended to be exhaustive. Other information necessary for the complete review of the building permit submission may be required by the Chief Building Official and in accordance with § 363.