Submission checklists › Toronto Building

Non-Residential "Full" Building Permit

City of Toronto: Toronto Building · version August 25, 2021, Rev. 2

Cover letter including

1Brief description of proposed work
1Contents of the submission
1Note: in the cover letter, include the file reference number of the submitted related building permit application

Application forms

2Application For a Permit to Construct or Demolish Form
3Commitment to General Reviews – By Architect and Engineers Form
4Tree Declaration Form
5Vibration Control Declaration Form, including zone of influence map, pre-construction survey and monitoring program
6Municipal Road Damage Deposit Form. The form and payment are not required if Site Plan approval is required. Where Site Plan Approval is not required, a Municipal Damage Deposit Form is required for intake of the Building permit. (MRDD fees may be payable to Transportation Services; such payment will not hold up intake of the Building permit application.)
7Green Roof Declaration Form
8City Planning Green Roof Statistics Sheet
9Ontario Building Code Supplementary Standard SB-10 Project Information Plan
10Fees. Upon submitting all required forms and documents, the City sends a submission status letter indicating any deficiencies or, if complete, the required fees. All fees must be paid before the application is processed and review commences. (Applicants can send permit fee calculations to their Toronto Building contact for review in advance to expedite the fees; final fee confirmation depends on the final design submitted.)

Plans and drawings

11Survey Plan or Pre-construction Survey, including property easements as applicable
12Architectural Drawings including: Toronto Green Standard Statistics Template and Checklists
13Context Plan
14Site Plans Drawing, including:
  • Site plan showing property lines, lot area (referenced to a current survey)
  • Key plan showing location of existing/proposed construction
  • Location of all existing/proposed buildings with overall dimensions and setback dimensions to property lines and adjacent buildings
  • Summary of permitted and proposed zoning provisions (not a requirement; beneficial if submitted for the reviewer)
  • Indicate fire route, fire department connections and fire hydrants
  • All parking/loading spaces, including Barrier Free information such as curb cuts, designated accessible parking spaces, access ramps and all associated details
21Floor Plans Drawings
22Roof Plans Drawings
23Elevations Drawings
24Sections Drawings
25Ontario Building Code Matrix
26Grading Plans
27Site Servicing Plan
28Structural Drawings
29Electrical Drawings
30Mechanical Drawings
31Construction Details and Notes Drawings
32Sprinkler Layout Plan
33Shoring Drawings (as required)

Technical supporting information

34Vibration Control and Zone of Influence Report
35Construction Noise & Vibration Monitoring Plan
36Construction Noise & Vibration Assessment Report
37Design Calculations
38Building Code Compliance Report
39Geotechnical Engineering Report: includes all report updates; additional letters from the geotechnical engineer must be included

Notes

40Property Owner Consent: Private Property Tie-back Agreements or Authorizations (as required for tie-backs into adjacent private properties)
41Property Owner Consent: Tie-back & Piling Agreement with City Transportation Services (as required for tie-backs within the ROW)
42A Green Roof Inspection Report Checklist will be required at final inspection.
43Separate Alternative Solution Permit to be provided with the Building Application (if required).
44This Permit Application Checklist should be read in conjunction with the Permit Application Checklist – General Notes.

Submission requirements for building permit application are governed by Article 3 of Toronto Municipal Code, Chapter 363. This checklist identifies the scope of information typically required to support processing of this type of application in accordance with Chapter 363. Nevertheless, it is the responsibility of the applicant to consult with the approval authority prior to application submission to confirm the submission requirements for more complex applications. This checklist is not intended to be exhaustive. Other information necessary for the complete review of the building permit submission may be required by the Chief Building Official and in accordance with § 363.

Permits this checklist is for