Permit Library › Other GTA municipalities › Town of Whitby › Building permits (Building Services)
Model Home Building Permit (Whitby)
Building permit for a model home, a separate fee class in the Town of Whitby 2026 Building Permit Fees, Schedule N to By-law 7220-17 [whitby.ca].
You need it when: You build a model home in a new Whitby development.
Why is it needed?
- The Town's 2026 fee schedule lists model homes as their own building permit fee class [whitby.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- The Building Permits page does not describe a separate model home process, so confirm the steps with Building Services before you apply [whitby.ca].
- Confirm the house meets the Zoning By-law first, as a minor variance may be required if it does not [whitby.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (Feb 2026) [whitby.ca]
- Schedule 1 Designer Information Form [whitby.ca]
- Architectural drawings [whitby.ca]
- Applicable Law Checklist [whitby.ca]
How do you submit it?
- Apply on the E-Portal at portal.whitby.ca or on paper at the Building Services Division, 3050 Garden St. Unit 102, Whitby ON L1R 2G7 [whitby.ca].
- Email to buildingpermits@whitby.ca is accepted only for listed types such as demolition, signs and commercial work [whitby.ca].
What are the fees?
2026 fee: $22.37 per m2 for a model home (2026 Building Permit Fees, Schedule N to By-law 7220-17) [whitby.ca].
Forms and guides
- Whitby 2026 Building Permit Fees (Schedule N to By-law 7220-17) (Town of Whitby, fee schedule)
- Whitby Application for a Permit to Construct or Demolish (Feb 2026) (Town of Whitby, application form)
- Whitby Applicable Law Checklist (Town of Whitby, checklist)
- Whitby Letter of Authorization (Town of Whitby, application form)
Official pages
Track Model Home Building Permit (Whitby) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.