Building Permit: Small Building, Part 9 (Whitby)
Building permit from Whitby Building Services for a Part 9 building other than a house, such as a stacked townhouse or a small commercial building, under the Building Code Act [ON].
You need it when: You build a stacked townhouse, an infill townhouse or a small commercial, industrial or institutional building in Whitby that falls under Part 9 of the Building Code.
Why is it needed?
- The Town requires a permit for new industrial, commercial and institutional buildings, and lists stacked townhouse and townhouse (infill) as E-Portal permit types [whitby.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- If the property is subject to site plan control, you may have to get site plan approval before you apply [whitby.ca].
- Confirm zoning first, and get any CLOCA, Town Engineering, Ministry of Transportation or Region of Durham approval the project needs before you apply [whitby.ca].
How long does review take?
Plan for about 15 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (Feb 2026) [whitby.ca]
- Schedule 1: Designer Information Form [whitby.ca]
- Architectural drawings, plus grading, structural and HVAC drawings where they apply [whitby.ca]
- Applicable Law Checklist [whitby.ca]
- Flow Control Roof Drainage Declaration Form and Commitment to General Review by Architects and Engineers, where they apply [whitby.ca]
How do you submit it?
- Townhouse types go on the E-Portal at portal.whitby.ca, and commercial, industrial and institutional buildings go by email to buildingpermits@whitby.ca or on paper at Building Services Division, 3050 Garden St. Unit 102 [whitby.ca].
- Every submission is pre-screened, then next steps and an invoice are emailed, and total fees over $20,000 must be paid by cheque in person [whitby.ca].
What are the fees?
2026 fees are by use and floor area, for example $22.37 per m2 for new townhouses (BGP-6), $25.39 per m2 for a new finished business building, $27.80 per m2 for finished mercantile and $17.42 per m2 for finished industrial, with a $305.00 minimum (2026 Building Permit Fees, Schedule N to By-law 7220-17) [whitby.ca].
Forms and guides
- Whitby 2026 Building Permit Fees (Schedule N to By-law 7220-17) (Town of Whitby, fee schedule)
- Whitby Application for a Permit to Construct or Demolish (Feb 2026) (Town of Whitby, application form)
- Whitby Applicable Law Checklist (Town of Whitby, checklist)
- Whitby Letter of Authorization (Town of Whitby, application form)
- Whitby Flow Control Roof Drainage Declaration Form (Town of Whitby, application form)
- Whitby E-Portal Building Permit Type Definitions (Town of Whitby, guide)
- Whitby E-Portal Documentation Required (Residential) (Town of Whitby, checklist)
- Whitby E-Portal Submission Standards (Town of Whitby, guide)
- Whitby Email Documentation Required (Non-residential) (Town of Whitby, checklist)
- Whitby Email Submission Documentation Requirements (Non-residential) (Town of Whitby, guide)
- Whitby Email File Naming Convention (ICI) (Town of Whitby, guide)
Official pages
Track Building Permit: Small Building, Part 9 (Whitby) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.