Permit Library › Other GTA municipalities › Town of Whitby › Building permits (Building Services)
Building Permit: Large Building, Part 3 (Whitby)
Building permit from Whitby Building Services for a Part 3 building such as a commercial, industrial, institutional or mid-rise residential building, under the Building Code Act [ON].
You need it when: You build or add to a commercial, industrial, institutional, mid-rise or apartment building in Whitby that falls under Part 3 of the Building Code.
Why is it needed?
- The Town requires a permit for industrial, commercial and institutional new builds and alterations [whitby.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- If the property is subject to site plan control, you may have to get site plan approval before you apply [whitby.ca].
- Confirm the work meets the Zoning By-law first, because a proposal that does not comply may need a minor variance from the Committee of Adjustment [whitby.ca].
- Approvals from CLOCA, Town Engineering, the Ministry of Transportation or the Region of Durham may be needed before you apply [whitby.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (Feb 2026) [whitby.ca]
- Schedule 1: Designer Information Form [whitby.ca]
- Architectural drawings, plus structural, HVAC and grading drawings where they apply, following the Town's non-residential email submission standards and ICI file naming convention [whitby.ca]
- Applicable Law Checklist [whitby.ca]
- Flow Control Roof Drainage Declaration Form and Commitment to General Review by Architects and Engineers, where they apply [whitby.ca]
- Letter of Authorization, if an agent applies for the owner [whitby.ca]
How do you submit it?
- Apply by email to buildingpermits@whitby.ca or on paper at Building Services Division, 3050 Garden St. Unit 102, Whitby ON L1R 2G7, because the E-Portal does not take this type [whitby.ca].
- Every submission is pre-screened, then next steps and an invoice are emailed, and total fees over $20,000 must be paid by cheque in person [whitby.ca].
What are the fees?
Examples of 2026 fees for new buildings: assembly $36.28 per m2, institutional $38.57 per m2, finished business $25.39 per m2, finished mercantile $27.80 per m2, finished industrial $17.42 per m2 and apartment $22.37 per m2 (2026 Building Permit Fees, Schedule N to By-law 7220-17) [whitby.ca].
Forms and guides
- Whitby 2026 Building Permit Fees (Schedule N to By-law 7220-17) (Town of Whitby, fee schedule)
- Whitby Application for a Permit to Construct or Demolish (Feb 2026) (Town of Whitby, application form)
- Whitby Applicable Law Checklist (Town of Whitby, checklist)
- Whitby Letter of Authorization (Town of Whitby, application form)
- Whitby Flow Control Roof Drainage Declaration Form (Town of Whitby, application form)
- Whitby Email Documentation Required (Non-residential) (Town of Whitby, checklist)
- Whitby Email Submission Documentation Requirements (Non-residential) (Town of Whitby, guide)
- Whitby Email File Naming Convention (ICI) (Town of Whitby, guide)
Official pages
Track Building Permit: Large Building, Part 3 (Whitby) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.