Permit Library › Other GTA municipalities › Town of Whitby › Building permits (Building Services)
Building Permit: Garage, Carport, Deck, Porch, Sunroom or Below-grade Entrance (Whitby)
Building permit from Whitby Building Services for a garage, carport, porch, sunroom, raised deck or below-grade entrance at a home, required under the Building Code Act [ON].
You need it when: You build a garage, carport, porch, sunroom, below-grade entrance or a deck more than 24 inches above grade at a Whitby home.
Why is it needed?
- The Town requires a permit for attached or detached garages, carports, porches, sunrooms, basement walkouts and decks greater than 24 inches above grade [whitby.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Confirm the structure meets the Zoning By-law before you apply, or you may need a minor variance from the Committee of Adjustment [whitby.ca].
- A Grading, Servicing and Drainage Permit from Town Engineering, or a CLOCA permit, may be needed before you apply [whitby.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (Feb 2026) [whitby.ca]
- Schedule 1: Designer Information Form [whitby.ca]
- Architectural drawings, plus grading and structural drawings where they apply [whitby.ca]
- Applicable Law Checklist [whitby.ca]
- Letter of Authorization, if an agent applies for the owner [whitby.ca]
How do you submit it?
- Apply on the E-Portal at portal.whitby.ca, by email to buildingpermits@whitby.ca, or on paper at Building Services Division, 3050 Garden St. Unit 102, Whitby ON L1R 2G7 [whitby.ca].
- Every submission is pre-screened, then next steps and an invoice for credit card payment are emailed [whitby.ca].
What are the fees?
2026 fees: $305.00 for decks and ramps (BGP-14), $10.65 per m2 for garages, carports, porches and accessory structures (BGP-15), and $305.00 for a below-grade entrance or underpinning (BGP-73), under the 2026 Building Permit Fees, Schedule N to By-law 7220-17 [whitby.ca].
Forms and guides
- Whitby 2026 Building Permit Fees (Schedule N to By-law 7220-17) (Town of Whitby, fee schedule)
- Whitby Application for a Permit to Construct or Demolish (Feb 2026) (Town of Whitby, application form)
- Whitby Applicable Law Checklist (Town of Whitby, checklist)
- Whitby Letter of Authorization (Town of Whitby, application form)
- Whitby E-Portal Building Permit Type Definitions (Town of Whitby, guide)
- Whitby E-Portal Documentation Required (Residential) (Town of Whitby, checklist)
- Whitby E-Portal Submission Standards (Town of Whitby, guide)
Official pages
Track Building Permit: Garage, Carport, Deck, Porch, Sunroom or Below-grade Entrance (Whitby) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.