Permit Library › Other GTA municipalities › City of Vaughan › Building permits (Building Standards)
Sign Permit (Vaughan)
Sign permit from Vaughan Building Standards under Sign By-law 140-2018, required before a sign is installed [vaughan.ca].
You need it when: You install a permanent sign, such as a wall or ground sign, or a billboard on a property in Vaughan.
Why is it needed?
- Sign By-law 140-2018 governs all signs, with exceptions in Section 4 and definitions in Section 2 [vaughan.ca].
- Under the Ontario Building Code, a sign is regulated by Division B Section 3.15 [ON].
When should you apply?
- Permits are required before a sign is installed [vaughan.ca].
- Under the Ontario Building Code, once an application is complete the chief building official decides within 10 business days for a sign (Item 1) [ON].
- On a property under a development agreement, contact Development Planning before design and permit applications, since the sign must meet the agreement [vaughan.ca].
- If the sign does not meet the Sign By-law, a sign variance is needed, and a Site Plan amendment may be required for certain buildings [vaughan.ca].
- The Sign Variance Committee meets monthly, with application deadlines about six weeks before each meeting, for example Nov 12 for the Dec 17, 2026 meeting [vaughan.ca].
- At inspection of a fixed sign, the inspector may require a general review letter from a qualified person or Professional Engineer [vaughan.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Commonly Used Applicable Laws and Building Permits form [vaughan.ca].
- Schedule 1 Designer Information Form and General Review Commitment Form, as required [vaughan.ca].
- Ministry of Transportation approval if a wall or ground sign is within 400 m of and visible from Highway 400, 407 or 427 [vaughan.ca].
- For a sign variance, the Sign Variance Application with a site plan or survey showing building and sign locations, and building elevations with dimensions and all existing signage [vaughan.ca].
How do you submit it?
- Apply online for fixed and wall signs; the City's online portal is available 24/7 [vaughan.ca].
- Email a sign variance application with digital documents to BuildingStandards@vaughan.ca; the non-refundable Sign Variance Fee is invoiced on receipt [vaughan.ca].
- Questions to Building Standards at 905-832-8510 [vaughan.ca].
What are the fees?
2026 fee: $221 plus $37 per m2 for a sign, $190 plus $47 per m2 for a billboard, and $1,391 for a sign variance application (Fees and Charges By-law 051-2026) [vaughan.ca].
Forms and guides
- Vaughan Building By-law 168-2024 (City of Vaughan, by-law)
Official pages
- Signs
- Signs information
- Sign By-law 140-2018, consolidated (PDF)
- Fees and Charges By-law 051-2026 (PDF)
Track Sign Permit (Vaughan) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.