Permit Library › Other GTA municipalities › City of Vaughan › Building permits (Building Standards)
Sewage System (Septic) Permit (Vaughan)
Building permit from Vaughan Building Standards for a new or altered septic system [vaughan.ca].
You need it when: You install a new septic or other on-site sewage system in Vaughan, or alter an existing one.
Why is it needed?
- The City's Septic page says a building permit is required for any alterations or proposed new septic installations [vaughan.ca].
- Building Standards issues permits for on-site sewage systems [vaughan.ca].
- The City's Septic page also points owners to the provincially mandated on-site sewage system maintenance inspection program [vaughan.ca].
When should you apply?
- Under Ontario Building Code Sentence (3), a sewage system takes the longer of 10 days and the period of the building it serves, once an application is complete; most serve houses, which take 10 business days [ON].
- For a new house or a finished basement, the building permit application includes the Sewage System Installer Information Form and a septic design where applicable [vaughan.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Drawings by a qualified designer: soil and water table information sheet, septic design criteria, site plan and cross sections [vaughan.ca].
- Treatment unit approval (BMEC or BNQ) [vaughan.ca].
- Commonly Used Applicable Laws form, Building Permit Applicant Authorization Form and Schedule 1 Designer Information Form [vaughan.ca].
- Sewage System Installer Information Form [vaughan.ca].
How do you submit it?
- Building permit applications are accepted through the Online Permitting Portal / ePlans Portal at eservices.vaughan.ca [vaughan.ca].
- Questions to Building Standards at buildingstandards@vaughan.ca or 905-832-8510 [vaughan.ca].
What are the fees?
See the City's 2026 Fees and Charges By-law 051-2026.
Forms and guides
- Vaughan Building By-law 168-2024 (City of Vaughan, by-law)
Official pages
- Septic
- Plumbing, HVAC, Septic and Tents
- Fees and Charges By-law 051-2026 (PDF)
- Online Permitting Portal / ePlans Portal
Track Sewage System (Septic) Permit (Vaughan) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.