Permit Library › Other GTA municipalities › City of Vaughan › Building permits (Building Standards)
Plumbing and Site Services Permit (Vaughan)
Building permit from Vaughan Building Standards for any addition or alteration of plumbing fixtures, water services and sewer services [vaughan.ca].
You need it when: You add or alter plumbing fixtures, water services or sewer services in Vaughan, including plumbing changes for a backflow prevention device.
Why is it needed?
- The City's Plumbing page says a building permit is required for any addition or alteration of plumbing fixtures, water and sewer services [vaughan.ca].
- Replacing plumbing fixtures generally does not need a building permit [vaughan.ca].
When should you apply?
- Under the Backflow Prevention Program, a building (plumbing) permit from Building Standards is required before plumbing changes are made for a backflow device [vaughan.ca].
- On a septic property, the Plumbing page sends you to the City's septic permit process [vaughan.ca].
- Finishing a basement with new or relocated plumbing fixtures needs a building permit, and a secondary suite needs its own separate permit [vaughan.ca].
- Under Ontario Building Code Sentences (3) and (4), plumbing, water services and drains take the longer of 10 days and the period of the building served, once an application is complete [ON].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Drawings by a designer showing name, registration number, BCIN, signature and responsibility statement, or drawings prepared by the owner [vaughan.ca].
- PDF drawings on standard sheets at a minimum scale of 1:75, dimensioned, signed and dated [vaughan.ca].
- For non-residential work, two copies of plumbing plans with a plan view showing new and relocated fixtures [vaughan.ca].
- Commonly Used Applicable Laws form, Building Permit Applicant Authorization Form, Schedule 1 Designer Information Form, and the Residential Plumbing Data Form or Non-housing Plumbing Data Sheet [vaughan.ca].
- For domestic backflow devices up to 50 mm, MAPAC 006, 007 or 008 drawings or Professional Engineer plans; over 50 mm, plans sealed by a Professional Engineer [vaughan.ca].
How do you submit it?
- Building permit applications are accepted through the Online Permitting Portal / ePlans Portal at eservices.vaughan.ca [vaughan.ca].
- For residential plumbing, contact Building Standards at 905-832-8510 about a permit expediter [vaughan.ca].
- Book the final plumbing inspection at 905-832-8511 [vaughan.ca].
What are the fees?
See the City's 2026 Fees and Charges By-law 051-2026.
Forms and guides
- Vaughan Building By-law 168-2024 (City of Vaughan, by-law)
Official pages
- Plumbing
- Non-housing Plumbing Data Sheet (PDF)
- Backflow Prevention Program
- Get a Secondary Suite / ADU
- Fees and Charges By-law 051-2026 (PDF)
- Online Permitting Portal / ePlans Portal
Track Plumbing and Site Services Permit (Vaughan) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.