Permit Library › Other GTA municipalities › City of Vaughan › Development Engineering permits

Residential Grading Permit and Infill Lot Grading Approval (Vaughan)

Residential grading permit from Vaughan Development Engineering, issued before the building permit for infill homes, additions, accessory structures and new basement walkouts or side entrances [vaughan.ca].

You need it when: You build a new house on an existing lot (infill), an addition, an accessory structure such as a shed or cabana, a deck, a basement walkout or walk-up, or a new side entrance or other exterior opening in Vaughan.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 15 business days. City guidance [vaughan.ca]

What documents does a complete application need?

How do you submit it?

What are the fees?

2026 fee: $1,003 for an infill lot grading permit (new home on an existing lot) or an addition or accessory structure over 40 m2, and $693 for an addition or accessory structure under 40 m2, which is also the fee for a side-door entrance or basement walkout (Fees and Charges By-law 051-2026) [vaughan.ca]. 2026 fee: $10,000 security deposit for a new infill home and $208 for a renewal (Fees and Charges By-law 051-2026) [vaughan.ca]. The fee includes two drawing reviews, and a permit revision is 50% of the fee [vaughan.ca].

Forms and guides

Official pages

Track Residential Grading Permit and Infill Lot Grading Approval (Vaughan) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.