Building Permit: Complex Building, High-rise or High-hazard (Vaughan)
Building permit under Vaughan Building By-law 168-2024, applied for through the City's industrial, commercial and institutional permit applications [vaughan.ca]. Complex buildings include post-disaster buildings, high buildings and high-hazard industrial buildings [ON].
You need it when: You build a high building, a post-disaster building or a high-hazard industrial building in Vaughan, the complex building class of the Building Code.
Why is it needed?
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality and sets a separate review period for complex buildings [ON].
- High-rise residential buildings are often subject to site plan control [vaughan.ca].
When should you apply?
- For a high-rise residential building, a site plan letter of undertaking or a site plan agreement must be approved and in place before you submit the building permit application [vaughan.ca].
- All of Vaughan is a site plan control area, and the landowner must enter into a Site Plan Agreement or Letter of Undertaking with the City before a building permit is issued, subject to exceptions [vaughan.ca].
- Submit the site plan application well before the building permit application, because a Site Plan Agreement must be registered on title before the building permit [vaughan.ca].
- The Building Code decision period starts only once an application is complete [ON]. The City's standard forms include an Acknowledgement of Incomplete Application Form [vaughan.ca].
- If you need to start part of the work before the full permit issues, ask about a conditional or partial permit (Building By-law 168-2024 s. 5.0(14) to (20)) [vaughan.ca].
How long does review take?
Plan for about 30 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application on the Online Permitting Portal / ePlans Portal, eservices.vaughan.ca [vaughan.ca]
- For a high-rise residential building: drawings sealed by an architect or professional engineer, with general review during construction where the Building Code requires it [vaughan.ca]
- Approved site plan, key plan, and architectural drawings with elevations as approved under site plan [vaughan.ca]
- Structural, HVAC and plumbing drawings with calculations, electrical, fire alarm, and sprinkler drawings with hydraulic calculations and a water demand curve [vaughan.ca]
- Specifications, site servicing, and on-site sewage drawings [vaughan.ca]
- Commonly Used Applicable Laws and Building Permits form, Building Permit Applicant Authorization Form and Schedule 1 Designer Information Form [vaughan.ca]
- Energy Efficiency Design Summary and Non-housing Plumbing Data Form [vaughan.ca]
How do you submit it?
- Apply on the City of Vaughan Online Permitting Portal / ePlans Portal at eservices.vaughan.ca [vaughan.ca]
- Building Standards: buildingstandards@vaughan.ca, 905-832-8510; building permit application questions: AE@vaughan.ca [vaughan.ca]
What are the fees?
See the City's 2026 Fees and Charges By-law 051-2026 [vaughan.ca].
Forms and guides
- Vaughan Building By-law 168-2024 (City of Vaughan, by-law)
Official pages
- High-rise residential buildings
- Industrial, commercial and institutional permit applications
- Site development (site plan) application
- Building permit forms, fees and portal manuals
- Fees and Charges By-law 051-2026
Track Building Permit: Complex Building, High-rise or High-hazard (Vaughan) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.