Permit Library › Other GTA municipalities › City of Vaughan › Building permits (Building Standards)
Building Permit: Garage, Shed, Deck, Porch or Cabana (Vaughan)
Building permit under Vaughan Building By-law 168-2024 for an accessory structure, garage, deck, porch, porch enclosure or basement walk-up at a home [vaughan.ca].
You need it when: You build a garage, carport, shed, cabana or other accessory structure, a deck or porch attached to a building, a porch enclosure or a basement walk-up at a Vaughan home.
Why is it needed?
- A permit is required for a detached accessory structure of 10 m2 or more, one attached to another structure regardless of size, or one of 10 m2 or less that contains plumbing [vaughan.ca].
- The City's general list of work that needs no permit includes a one-storey, storage-only shed up to 15 m2 with no plumbing that is not attached [vaughan.ca].
- Any deck or porch attached to a building needs a permit; an unattached, uncovered deck up to 18.6 m2 and not more than 0.6 m above grade does not, but must still meet the Zoning By-law [vaughan.ca].
- All basement walkouts, and any structure covering a porch, need a permit before construction [vaughan.ca].
When should you apply?
- For a new accessory structure such as a shed or cabana, get a grading permit from Development Engineering before you apply for the building permit [vaughan.ca].
- For a basement walkout or a new side entrance, the grading permit from Development Engineering is issued before the building permit application [vaughan.ca].
- For a deck, include the lot grading permit from Development Engineering with the drawings where it applies [vaughan.ca].
- A secondary suite needs a separate permit from the walkout permit [vaughan.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application on the Online Permitting Portal / ePlans Portal, eservices.vaughan.ca [vaughan.ca]
- Survey or site plan showing distances to lot lines [vaughan.ca]
- Foundation plan, floor or framing plan, elevations and sections; roof plan with truss drawings for an accessory structure, and pre-engineered guard details for a deck [vaughan.ca]
- For a walkout, a professional engineer's design where the foundation is less than 1200 mm below adjacent ground, or where walk-up stairs have a retaining wall over 1000 mm [vaughan.ca]
- Commonly Used Applicable Laws and Building Permits form, Building Permit Applicant Authorization Form and Schedule 1 Designer Information Form [vaughan.ca]
- Grading permit from Development Engineering; 2026 fee: $1,003 over 40 m2 or $693 under 40 m2 (Fees and Charges By-law 051-2026) [vaughan.ca]. The City's grading permit page also lists a $5,000 or $2,500 security deposit [vaughan.ca].
- Plumbing permit requirements for an accessory structure with plumbing, and TRCA approval and Urban Design and Cultural Heritage approval, where they apply [vaughan.ca]
How do you submit it?
- Apply on the City of Vaughan Online Permitting Portal / ePlans Portal at eservices.vaughan.ca [vaughan.ca]
- Building Standards: buildingstandards@vaughan.ca, 905-832-8510; building permit application questions: AE@vaughan.ca [vaughan.ca]
What are the fees?
For the building permit, see the City's 2026 Fees and Charges By-law 051-2026 [vaughan.ca]. The grading permit for a basement walkout or side entrance is charged as an addition under 40 m2; 2026 fee: $693 (Fees and Charges By-law 051-2026) [vaughan.ca].
Forms and guides
- Vaughan Building By-law 168-2024 (City of Vaughan, by-law)
Official pages
- Accessory structures
- Decks and porches
- Basement walkouts
- Grading permit for a new structure or addition
- Grading permit for a new home entrance or walkout
- Residential grading permit requirements
- Fees and Charges By-law 051-2026
Track Building Permit: Garage, Shed, Deck, Porch or Cabana (Vaughan) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.