Permit Library › Other GTA municipalities › Township of Uxbridge › Building permits (Development Services, Building Division)

Designated Structure Permit: Solar Panels, Retaining Wall, Telecom Tower or Wind Turbine (Uxbridge)

Permit from the Uxbridge Building Division for a designated structure such as solar collectors, a retaining wall, a telecom tower or a wind turbine, under the Ontario Building Code [ON].

You need it when: You install rooftop or wall-mounted solar panels, or build a retaining wall, telecom tower, wind turbine or other designated structure, in Uxbridge.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

Fees on the Permit Fees page (no year shown): solar collectors "$320 plus $1.75m2 on collectors over 230m2", retaining wall $4.05 per linear metre, telecom towers and wind turbines $305 per structure, and other designated structures $120 each [uxbridge.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Solar Panels, Retaining Wall, Telecom Tower or Wind Turbine (Uxbridge) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.