Permit Library › Other GTA municipalities › Township of Scugog › Building permits (Building Department)
Mechanical (HVAC), Fireplace or Wood Stove Permit (Scugog)
Building permit from the Township of Scugog under Building By-law 18-24 for a fireplace, woodstove, outdoor wood furnace or the HVAC work in a building project [scugog.ca].
You need it when: You install a fireplace, woodstove or outdoor wood furnace, or your building project in Scugog includes heating, ventilation or air conditioning work.
Why is it needed?
- A building permit is needed to install a fireplace or woodstove [scugog.ca].
- HVAC plans are among the construction plans a building permit application needs [scugog.ca].
- The Building Department inspects heating work [scugog.ca].
When should you apply?
- Get the permit before the appliance is installed [scugog.ca].
- When the heating work is part of a larger project, include the HVAC plans with that building permit application [scugog.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application on Cloudpermit [scugog.ca]
- Construction plans and other required plans, such as HVAC, EEDs and truss plans [scugog.ca]
- Owner's Authorization form when the applicant is not the owner [scugog.ca]
- Schedule 1 Designer Information form [scugog.ca]
How do you submit it?
- Apply online through Cloudpermit with the Township of Scugog as the location, or file a paper application at the Township Office [scugog.ca].
- Building Department: 905-985-7346 ext. 169, bdepartment@scugog.ca [scugog.ca].
What are the fees?
2026 fee: outdoor wood furnaces are a minor residential permit at a $145.12 flat fee (Required Building Fees 2026) [scugog.ca]. For other heating work, see the Required Building Fees 2026 [scugog.ca].
Forms and guides
- Scugog Building By-law 18-24 (Township of Scugog, by-law)
- Scugog Required Building Fees 2026 (Township of Scugog, fee schedule)
- Scugog Building Permit Guide for Homeowners (January 2026) (Township of Scugog, guide)
- Scugog Building Permit Requirements (Township of Scugog, checklist)
- Scugog How to Submit a Building Permit Application (Township of Scugog, guide)
- Scugog Owner's Authorization Form (Township of Scugog, application form)
- Scugog Schedule 1: Designer Information (Township of Scugog, application form)
Official pages
Track Mechanical (HVAC), Fireplace or Wood Stove Permit (Scugog) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.