Permit Library › Other GTA municipalities › Township of Scugog › Building permits (Building Department)

Designated Structure Permit: Retaining Wall, Telecommunication Tower or Solar Panels (Scugog)

Building permit from the Township of Scugog under Building By-law 18-24 for a designated structure such as a retaining wall, a telecommunication tower or solar panels [scugog.ca].

You need it when: You build a retaining wall, a telecommunication tower or a solar panel installation in Scugog.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

2026 fees: retaining walls $15.18 per linear metre, telecommunication towers $781.36 flat fee, and solar $187.85 flat fee plus $15.97 per panel (Required Building Fees 2026) [scugog.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Retaining Wall, Telecommunication Tower or Solar Panels (Scugog) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.