Permit Library › Other GTA municipalities › Township of Scugog › Building permits (Building Department)
Building Permit: Interior Alteration or Tenant Fit-up (Scugog)
Building permit under Scugog Building By-law 18-24 for interior alterations to a non-residential building, including tenant fit-ups and structural changes [scugog.ca].
You need it when: You alter the inside of a non-residential building in Scugog, such as a tenant fit-up, a structural change or a new opening.
Why is it needed?
- Non-residential interior alterations need a building permit [scugog.ca].
- Structural changes and a new entrance or window opening also need one [scugog.ca].
- A change of use to a greater hazard also needs a building permit [scugog.ca].
When should you apply?
- Once the completed application is received you are invoiced and pay the fees, then revise the application based on Township feedback [scugog.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Construction plans and other required plans, such as HVAC plans [scugog.ca]
- Schedule 1 Designer Information [scugog.ca]
- Owner's Authorization Form when someone other than the owner applies [scugog.ca]
How do you submit it?
- Apply online through Cloudpermit, keeping the Township of Scugog as the location, or bring a paper application to the Township Office [scugog.ca].
- Building Department: 905-985-7346 ext. 169, bdepartment@scugog.ca [scugog.ca].
What are the fees?
2026 fee: $8.25 per m2 for other alterations, with a $367.44 minimum for Groups A, B, D, E and F (Required Building Fees 2026) [scugog.ca]. Online card payments through Paymentus carry a 2.89% service fee [scugog.ca].
Forms and guides
- Scugog Building By-law 18-24 (Township of Scugog, by-law)
- Scugog Required Building Fees 2026 (Township of Scugog, fee schedule)
- Scugog Building Permit Requirements (Township of Scugog, checklist)
- Scugog How to Submit a Building Permit Application (Township of Scugog, guide)
- Scugog Owner's Authorization Form (Township of Scugog, application form)
- Scugog Schedule 1: Designer Information (Township of Scugog, application form)
Official pages
Track Building Permit: Interior Alteration or Tenant Fit-up (Scugog) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.