Permit Library › Other GTA municipalities › City of Richmond Hill › Building permits (Building Division)
Designated Structure Permit: Retaining Wall, Solar Panels or Wind Turbine (Richmond Hill)
Building permit under Richmond Hill Building By-law 19-24 for retaining walls, solar panels, wind turbines and other designated structures [richmondhill.ca].
You need it when: You build a retaining wall or other designated structure, or install solar panels or a wind turbine, in Richmond Hill.
Why is it needed?
- The Building Permits page lists retaining walls and designated structures as work that needs a permit [richmondhill.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to designated structure permits in every Ontario municipality [ON].
When should you apply?
- Pre-approvals that apply, such as TRCA approval in a regulated area or CNR approval near a rail corridor, must be in place before the permit is issued [richmondhill.ca].
- After pre-screening, the formal submission and fee must arrive within two weeks of the City's confirmation email, or the reference number lapses [richmondhill.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish [richmondhill.ca]
- Schedule 1 Designer Information [richmondhill.ca]
- Site plan and structural drawings [richmondhill.ca]
How do you submit it?
- Apply and pay online through the City's EnerGov Self Service permit portal, where solar panels and designated structures fall under the Misc. Alteration permit type [richmondhill.ca].
What are the fees?
Building By-law 19-24 Schedule A Table 3.1 (2026): solar panels $379.61 flat, wind turbines $249.81 flat, retaining wall $11.56 per m to a maximum of $602.22 [richmondhill.ca].
Forms and guides
- Richmond Hill Building By-law 19-24, as amended (City of Richmond Hill, by-law)
- Richmond Hill Building By-law 19-24, Schedule A permit fees (2026) (City of Richmond Hill, fee schedule)
- Richmond Hill Application for a Permit to Construct or Demolish (City of Richmond Hill, application form)
- Richmond Hill Schedule 1: Designer Information (City of Richmond Hill, application form)
Official pages
- Building permits
- Building permit fees, By-law 19-24 Schedule A (PDF)
- EnerGov Self Service permit portal
Track Designated Structure Permit: Retaining Wall, Solar Panels or Wind Turbine (Richmond Hill) free.