Permit Library › Other GTA municipalities › City of Richmond Hill › Building permits (Building Division)

Designated Structure Permit: Retaining Wall, Solar Panels or Wind Turbine (Richmond Hill)

Building permit under Richmond Hill Building By-law 19-24 for retaining walls, solar panels, wind turbines and other designated structures [richmondhill.ca].

You need it when: You build a retaining wall or other designated structure, or install solar panels or a wind turbine, in Richmond Hill.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

Building By-law 19-24 Schedule A Table 3.1 (2026): solar panels $379.61 flat, wind turbines $249.81 flat, retaining wall $11.56 per m to a maximum of $602.22 [richmondhill.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Retaining Wall, Solar Panels or Wind Turbine (Richmond Hill) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.