Tenant Permit: Interior Alteration or Unit Finish (Richmond Hill)
Tenant permit under Richmond Hill Building By-law 19-24 for an interior alteration or unit finish in an existing non-residential building [richmondhill.ca].
You need it when: You alter an existing or newly occupied commercial, industrial or institutional unit in Richmond Hill, including a tenant unit finish.
Why is it needed?
- A tenant permit is required for an alteration to an existing or newly occupied space [richmondhill.ca].
- It is also required for a change in Building Code occupancy or an increase in hazard, even with no construction [richmondhill.ca].
- After the permit is issued and the final inspection passes, the City issues an occupancy certificate or a building permit sign off certificate, and then you may occupy [richmondhill.ca].
When should you apply?
- Check zoning with Zoning staff before you lease or buy, and get the Letter of Use that tenant permits need as a pre-approval [richmondhill.ca].
- After pre-screening, send the formal submission and full fee within two weeks of the confirmation email, or the reference number lapses [richmondhill.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Tenant Permit Checklist and Application [richmondhill.ca]
- Letter of Use [richmondhill.ca]
- Architectural, mechanical (HVAC, plumbing, sprinkler) and electrical drawings, plus structural drawings if the structure changes [richmondhill.ca]
- Drawings by a BCIN-qualified designer, or stamped by an architect or professional engineer where the scope requires [richmondhill.ca]
- Schedule 1 Designer Information and P1 Plumbing and Drain Worksheet [richmondhill.ca]
How do you submit it?
- Apply as a Tenant Unit Finish/Alteration permit through the City's EnerGov Self Service portal at permits.richmondhill.ca [richmondhill.ca].
- Building Division: building@richmondhill.ca, 905-771-8810 [richmondhill.ca].
What are the fees?
2026 alteration fees (Building By-law 19-24 Schedule A, Table 3.2) per m2: restaurant $14.23, other assembly, institutional and business and personal services $9.14, mercantile and industrial $6.98 [richmondhill.ca]. The minimum permit fee for non-residential work is $420.24 [richmondhill.ca].
Forms and guides
- Richmond Hill Building By-law 19-24, as amended (City of Richmond Hill, by-law)
- Richmond Hill Building By-law 19-24, Schedule A permit fees (2026) (City of Richmond Hill, fee schedule)
- Richmond Hill Application for a Permit to Construct or Demolish (City of Richmond Hill, application form)
- Richmond Hill Schedule 1: Designer Information (City of Richmond Hill, application form)
- Richmond Hill L1 Applicable Law Declaration (City of Richmond Hill, checklist)
- Richmond Hill P1 Plumbing and Drain Worksheet (City of Richmond Hill, application form)
Official pages
Track Tenant Permit: Interior Alteration or Unit Finish (Richmond Hill) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.