Building Permit: New House, Addition, Alteration or Additional Residential Unit (Richmond Hill)
Building permit under Richmond Hill Building By-law 19-24 for a new house, an addition, a renovation or an additional residential unit, issued by the Building Division [richmondhill.ca].
Why is it needed?
- A permit is required for new buildings, renovations and material alterations, additions including sunrooms, and finishing a basement [richmondhill.ca].
- By-law 143-24 allows up to three additional residential units per lot, with up to two in an accessory building [richmondhill.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- An addition over 400 sq ft needs a Site Alteration Permit from Development Engineering before the building permit [richmondhill.ca].
- In a new subdivision, the City needs a registered M-plan and municipal addresses before it accepts permits for singles, semis and townhouses [richmondhill.ca].
- Pay Invoice 1 (education development charges, cash-in-lieu of parkland, water meter charge and related fees) before the permit is issued, while City and Region development charges on new homes, other than rental housing, are deferred to the occupancy permit [richmondhill.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish and Schedule 1 Designer Information [richmondhill.ca]
- R1 New House or R2 Addition/Alteration checklist, with site plan, architectural and structural drawings and roof truss and floor joist drawings where they apply [richmondhill.ca]
- Energy Efficiency Design Summary (EEDS) and P1 Plumbing and Drain Worksheet [richmondhill.ca]
- L1 Applicable Law Declaration, with pre-approvals such as a Site Alteration Permit, Committee of Adjustment decision, Heritage or TRCA approval where they apply [richmondhill.ca]
- Precautions during Excavation Declaration for infill work [richmondhill.ca]
- Unprotected, flattened PDFs with electronically signed forms and plans at a scale no smaller than 3/16" = 1'-0" [richmondhill.ca]
How do you submit it?
- Apply and pay by credit card through the City's EnerGov Self Service portal at permits.richmondhill.ca, which issues the permit electronically [richmondhill.ca].
- Building Division: building@richmondhill.ca, 905-771-8810, with zoning questions by email only [richmondhill.ca].
What are the fees?
2026 fees (Building By-law 19-24 Schedule A): $27.37 per m2 for a new single, semi, townhouse or duplex or an addition, $10.40 per m2 for residential and additional residential unit alterations, $6.56 per m2 to finish a basement, and a $210.12 minimum for Part 9 residential [richmondhill.ca]. Plumbing adds $28.40 per fixture, $47.97 for a water service up to 50 mm and $196.61 for a residential drain and sewer [richmondhill.ca].
Forms and guides
- Richmond Hill Building By-law 19-24, as amended (City of Richmond Hill, by-law)
- Richmond Hill Building By-law 19-24, Schedule A permit fees (2026) (City of Richmond Hill, fee schedule)
- Richmond Hill Application for a Permit to Construct or Demolish (City of Richmond Hill, application form)
- Richmond Hill Schedule 1: Designer Information (City of Richmond Hill, application form)
- Richmond Hill L1 Applicable Law Declaration (City of Richmond Hill, checklist)
- Richmond Hill P1 Plumbing and Drain Worksheet (City of Richmond Hill, application form)
Official pages
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.