Permit Library › Other GTA municipalities › City of Richmond Hill › Building permits (Building Division)
Building Permit: Garage, Shed, Deck, Porch or Basement Walkout (Richmond Hill)
Building permit under Richmond Hill Building By-law 19-24 for a garage, carport, shed, deck, porch or basement walkout at a home [richmondhill.ca].
You need it when: You build a garage, carport, shed or other accessory building, a deck or porch, or a basement walkout at a Richmond Hill home.
Why is it needed?
- No permit is needed for a detached accessory building up to 10 m2 without plumbing, or a one-storey storage shed up to 15 m2 without plumbing, but zoning still applies [richmondhill.ca].
- A deck more than 600 mm above grade needs a permit [richmondhill.ca].
When should you apply?
- A detached building over 400 sq ft needs a Site Alteration Permit from Development Engineering before the building permit [richmondhill.ca].
- Get TRCA approval first if the lot is in a TRCA regulated area [richmondhill.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish and Schedule 1 Designer Information [richmondhill.ca]
- R4 Basement Walkout, R5 Garage/Carport/Shed or R6 Deck checklist items [richmondhill.ca]
- Site plan, architectural and structural drawings, with roof truss drawings where they apply [richmondhill.ca]
- L1 Applicable Law Declaration [richmondhill.ca]
How do you submit it?
- Apply and pay by credit card through the City's EnerGov Self Service portal at permits.richmondhill.ca, which issues the permit electronically [richmondhill.ca].
- Building Division: building@richmondhill.ca, 905-771-8810, with zoning questions by email only [richmondhill.ca].
What are the fees?
2026 fees (Building By-law 19-24 Schedule A): $382.30 flat for an accessory garage or structure up to 50 m2, $546.14 flat over 50 m2, and $218.46 flat for an unenclosed deck or porch [richmondhill.ca]. The minimum permit fee for Part 9 residential is $210.12 [richmondhill.ca].
Forms and guides
- Richmond Hill Building By-law 19-24, as amended (City of Richmond Hill, by-law)
- Richmond Hill Building By-law 19-24, Schedule A permit fees (2026) (City of Richmond Hill, fee schedule)
- Richmond Hill Application for a Permit to Construct or Demolish (City of Richmond Hill, application form)
- Richmond Hill Schedule 1: Designer Information (City of Richmond Hill, application form)
- Richmond Hill L1 Applicable Law Declaration (City of Richmond Hill, checklist)
Official pages
Track Building Permit: Garage, Shed, Deck, Porch or Basement Walkout (Richmond Hill) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.