Permit Library › Other GTA municipalities › City of Pickering › Building permits (Building Services)
Plumbing, Drains and Backflow Device Permit (Pickering)
Building permit from Pickering Building Services for any plumbing work, including backwater valves and backflow devices, under the Ontario Building Code [pickering.ca].
You need it when: You install or alter any plumbing, drains, a backwater valve or a backflow device in Pickering.
Why is it needed?
- Pickering requires a building permit for any plumbing work, and for backwater valves and backflow devices [pickering.ca].
- An attached accessory structure, or one with plumbing, needs a permit regardless of size [pickering.ca].
- Fixture swaps, sump pumps and hot water tanks need no permit, but zoning still applies [pickering.ca].
When should you apply?
- Some properties need approvals from agencies such as TRCA, CLOCA or Durham Region Health before a building permit is issued [pickering.ca].
- A permit is issued once all fees, deposits and charges are paid and the City has confirmed compliance with the Ontario Building Code [pickering.ca].
- Once the permit is issued, construction may start any time within 6 months [pickering.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Plumbing Data Form [pickering.ca]
- Documents from the City's residential required documents list, as unlocked, flattened PDFs [pickering.ca]
- Schedule 1 Designer Information form [pickering.ca]
- Agent Authorization form CDD1605 if a designer or contractor applies for you [pickering.ca]
How do you submit it?
- Call Building Services at 905.420.4631 to start, then apply through the Permit Submission Portal at mycity.pickering.ca [pickering.ca].
- Applications are fully electronic, printed copies are no longer accepted at the counter, and drawings sent by email are not accepted [pickering.ca].
What are the fees?
2026 fee: water and sewer connections $180 each, charged as a minor residential structure (Schedule of Application Fees, July 1, 2026) [pickering.ca].
Forms and guides
- Pickering Schedule of Application Fees and Information Price List (July 1, 2026) (City of Pickering, fee schedule)
- Pickering Required Documents for Residential Building Permits (City of Pickering, checklist)
- Pickering Plumbing Data Form (City of Pickering, application form)
- Pickering Schedule 1 Designer Information Form (City of Pickering, application form)
- Pickering Agent Authorization (CDD1605) (City of Pickering, application form)
Official pages
Track Plumbing, Drains and Backflow Device Permit (Pickering) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.