Mechanical (HVAC), Chimney and Wood Stove Permit (Pickering)
Building permit from Pickering Building Services for heating systems, chimneys, fireplaces and wood stoves, which must meet the Ontario Building Code [pickering.ca].
You need it when: You install or alter a heating system, chimney, fireplace or wood stove in Pickering.
Why is it needed?
- Pickering lists heating systems, chimneys, fireplaces and wood stoves among the work that needs a permit [pickering.ca].
- A furnace in a detached house, air conditioning and gas fireplaces need no permit, but zoning still applies [pickering.ca].
When should you apply?
- A permit is issued once all fees, deposits and charges are paid and the City has confirmed compliance with the Ontario Building Code [pickering.ca].
- Once the permit is issued, construction may start any time within 6 months [pickering.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Energy Efficiency Design Summary, prescriptive or performance form [pickering.ca]
- Documents from the City's residential required documents list, as unlocked, flattened PDFs [pickering.ca]
- Schedule 1 Designer Information form [pickering.ca]
- Agent Authorization form CDD1605 if a designer or contractor applies for you [pickering.ca]
How do you submit it?
- Call Building Services at 905.420.4631 to start, then apply through the Permit Submission Portal at mycity.pickering.ca [pickering.ca].
- Applications are fully electronic, printed copies are no longer accepted at the counter, and drawings sent by email are not accepted [pickering.ca].
What are the fees?
2026 fee: fireplaces $180 each, charged as a minor residential structure (Schedule of Application Fees, July 1, 2026) [pickering.ca].
Forms and guides
- Pickering Schedule of Application Fees and Information Price List (July 1, 2026) (City of Pickering, fee schedule)
- Pickering Required Documents for Residential Building Permits (City of Pickering, checklist)
- Pickering Schedule 1 Designer Information Form (City of Pickering, application form)
- Pickering Agent Authorization (CDD1605) (City of Pickering, application form)
- Pickering Energy Efficiency Design Summary: Performance (City of Pickering, application form)
- Pickering Energy Efficiency Design Summary: Prescriptive (City of Pickering, application form)
Official pages
Track Mechanical (HVAC), Chimney and Wood Stove Permit (Pickering) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.