Building Permit: New House, Addition or Additional Dwelling Unit (Pickering)
Building permit from Pickering Building Services for a new house, an addition or an additional dwelling unit, under the Ontario Building Code and the City's Building By-law [pickering.ca].
Why is it needed?
- Pickering requires a building permit for new buildings and additions, second suites, garage conversions, finished basements, removing walls, new or enlarged windows and doors, underpinning and basement entrances [pickering.ca].
- Up to two additional dwelling units are allowed on most residential properties, and the pre-reviewed detached ADU designs still need a building permit to confirm zoning [pickering.ca].
- Plans must meet the Ontario Building Code, the zoning by-law and other applicable law, and building without a permit is a provincial offence [pickering.ca].
When should you apply?
- Some properties have extra requirements to meet before a building permit is issued, and agencies such as TRCA, CLOCA, MTO or Durham Region Health may need to approve before you apply [pickering.ca].
- The City's permit list marks a basement entrance as "(P. Eng. Required)", so a professional engineer must be involved [pickering.ca].
- The permit is issued once all fees, deposits and charges are paid and Building Code compliance is confirmed, and construction may start any time within 6 months of issue [pickering.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Ontario Application for a Permit to Construct or Demolish, filed in the Permit Submission Portal [pickering.ca]
- Drawings and documents from the Required Documents for Residential Building Permits list, as unlocked, flattened PDFs [pickering.ca]
- Schedule 1 Designer Information form and Applicable Law Checklist (CDD1206) [pickering.ca]
- Energy Efficiency Design Summary (Performance or Prescriptive) and Plumbing Data Form [pickering.ca]
- Agent Authorization form (CDD1605) if a designer or contractor applies for the owner [pickering.ca]
How do you submit it?
- Call Building Services at 905.420.4631 to start, then apply through the Permit Submission Portal at mycity.pickering.ca [pickering.ca].
- Drawings sent by email and printed copies are no longer accepted, and fees can be paid in the portal or at the counter at One The Esplanade [pickering.ca].
What are the fees?
2026 fee: $20.12 per m2 of gross floor area for residential buildings of 1 to 20 storeys, minimum $180, and $7.37 per m2 for finished basements and apartments in houses (Schedule of Application Fees, July 1, 2026) [pickering.ca]. Performance deposit: $2,379 for a new house or an addition over 60 m2, or $1,000 for a secondary suite, finished basement or basement walk-up [pickering.ca]. An initial minimum fee is billed at submission and later bills are emailed at each stage of review [pickering.ca].
Forms and guides
- Pickering Schedule of Application Fees and Information Price List (July 1, 2026) (City of Pickering, fee schedule)
- Pickering Required Documents for Residential Building Permits (City of Pickering, checklist)
- Pickering Guide to Online Building Permit Applications (City of Pickering, guide)
- Pickering Applicable Law Checklist (CDD1206) (City of Pickering, checklist)
- Pickering Plumbing Data Form (City of Pickering, application form)
- Pickering Schedule 1 Designer Information Form (City of Pickering, application form)
- Pickering Acknowledgement of Incomplete Application (City of Pickering, application form)
- Pickering City Expectations for Builders (City of Pickering, guide)
- Pickering Agent Authorization (CDD1605) (City of Pickering, application form)
- Pickering Energy Efficiency Design Summary: Performance (City of Pickering, application form)
- Pickering Energy Efficiency Design Summary: Prescriptive (City of Pickering, application form)
Official pages
- Building permits in Pickering
- Additional dwelling units
- Required documents for residential permits (PDF)