Region of Peel Temporary Hydrant / Non-Potable Construction Water Permit
Site-specific temporary non-potable water connection for construction, valid 12 months. Only authorized people may operate Peel hydrants (Water By-law 6-2017) [PEEL].
You need it when: Using a Peel fire hydrant or temporary connection for construction water.
Why it's needed
- Operating a municipal hydrant without Peel's authorization is prohibited; bulk water must not leave the Region [PEEL].
When to apply
- Before construction water is needed; renew each year with a current backflow test report [PEEL].
Review time
Plan for about 10 business days. estimate
Documents for a complete application
- Temporary hydrant permit application [PEEL]
- Certificate of Insurance [PEEL]
- Reduced pressure principle (RP) backflow assembly and test report [PEEL]
- Certified water meter with calibration report; secondary valve; insulated box in freezing weather [PEEL]
How to submit
- Email the application to Peel's backflow prevention team; 905-791-7800 ext. 3101 [PEEL].
Fees
$267 plus HST per year, plus water consumption and valving fees [PEEL].
Forms and guides
- Region of Peel Temporary Hydrant Permit Application (Feb 2025) (Region of Peel, application form)
Official pages
Track Region of Peel Temporary Hydrant / Non-Potable Construction Water Permit free.
Track this permit freeDeadlines in business days, email alerts before decisions are due, and your whole team in one place.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.