Permit Library › Other GTA municipalities › Town of Oakville › Roads and right-of-way (Development Engineering, Transportation and Engineering)
Road Closure Permit for Construction (Oakville)
Road Closure Permit to close a Town of Oakville road for construction, applied for with a Temporary Street Occupation permit under the Municipal Right of Way By-law [oakville.ca].
You need it when: Work will close a Town of Oakville road for construction.
Why is it needed?
- Activities on the municipal right-of-way, including road allowances, public walkways and municipal parking lots, need road corridor permits under the Municipal Right of Way By-law, amended by By-law 2025-062 [oakville.ca].
- A road closure for construction needs a Temporary Street Occupation (TSO) permit in addition to the Road Closure Permit [oakville.ca].
- Road closures for events use the Special Event on Municipal Right-of-Way Permit instead [oakville.ca].
When should you apply?
- The Town says the "Application must be submitted at least 20 business days in advance of the start of the road closure" [oakville.ca].
- The TSO permit and the Road Closure Permit go in together under one application, so prepare both at the same time [oakville.ca].
How long does review take?
Plan for about 20 business days. minimum lead time [oakville.ca]
What documents does a complete application need?
- One online application covering the Road Closure Permit and the TSO permit [oakville.ca]
How do you submit it?
- Apply through Development Engineering online services, where both permits are processed under one application [oakville.ca].
What are the fees?
Fees are in the current year's Transportation and Engineering Right of Way Management Rates and Fees Schedule on the Town's rates and fees page [oakville.ca].
Official pages
Track Road Closure Permit for Construction (Oakville) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.