Permit Library › Other GTA municipalities › Town of Newmarket › Building permits (Building Division)

Designated Structure Permit: Retaining Wall or Solar Panels (Newmarket)

Building permit from the Newmarket Building Division for a designated structure such as a retaining wall over 1 m high or solar panels, under the Ontario Building Code [ON].

You need it when: You build a retaining wall over 1 m high or install solar panels on a property in Newmarket.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

2026 fee: $200 for residential roof solar panels (Schedule I) [newmarket.ca]. The 2026 minimum application deposit (non-refundable) is $200 for a construction value of $50,000 or less, $500 for over $50,000 to $500,000 and $1,000 for all others (Schedule I) [newmarket.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Retaining Wall or Solar Panels (Newmarket) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.