Building Permit: Small Building, Part 9 (Newmarket)
Building permit under the Ontario Building Code for a Part 9 building other than a house, issued by the Town of Newmarket Building Division [newmarket.ca].
Why is it needed?
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
- The whole Town of Newmarket is a site plan control area under Planning Act s. 41 [newmarket.ca].
When should you apply?
- Building permits are not typically accepted or issued until the site plan control requirements are addressed, because the whole Town is a site plan control area [newmarket.ca].
- A detached commercial or industrial accessory structure up to 37 m2 of gross floor area, and minor additions such as vestibules, stairwells and accessibility ramps, may be considered for a site plan exemption [newmarket.ca].
- Construction must seriously commence within six months of issue, or the permit can be revoked [newmarket.ca].
How long does review take?
Plan for about 15 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application on the Development Portal [newmarket.ca]
- Site plan, floor plans, elevations, sections and mechanical drawings as unlocked black-and-white PDFs with the submission date in the title block [newmarket.ca]
- Energy Efficiency Compliance Checklist for Part 9 non-residential buildings [newmarket.ca]
- Schedule 1 Designer Information form and Applicable Law Declaration [newmarket.ca]
How do you submit it?
- Apply and track the application on the Town's Development Portal (Accela), with drawings as unlocked black-and-white PDFs and no file-share links, .zip or .jpeg files [newmarket.ca].
- Building Division: building.permits@newmarket.ca, 905-953-5300 ext. 2400 [newmarket.ca].
What are the fees?
2026 fees per m2 (Schedule I Building Permit Fees 2026): assembly $21.40, institutional $24.92, business $15.34 shell or $19.18 finished, mercantile $14.21 shell or $17.77 finished, industrial $11.55 shell or $14.43 finished, and parking garage or farm building $6.93 [newmarket.ca]. A non-refundable minimum application deposit applies: $200 for a construction value of $50,000 or less, $500 for over $50,000 to $500,000, and $1,000 for all others [newmarket.ca].
Forms and guides
- Newmarket Building Permit Fees and Charges, Schedule I 2026 (Town of Newmarket, fee schedule)
Official pages
- Building and renovating in Newmarket
- Development documents and site plan control
- Building permit fees 2026 (Schedule I)
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.