Permit Library › Other GTA municipalities › Town of Newmarket › Building permits (Building Division)
Building Permit: Interior Alteration or Tenant Fit-up (Newmarket)
Building permit under the Ontario Building Code for interior alterations and tenant fit-ups in an existing building, issued by the Newmarket Building Division [newmarket.ca].
You need it when: You add or remove walls, make structural alterations or change plumbing or HVAC inside an existing building in Newmarket, including a tenant fit-up.
Why is it needed?
- Adding or removing walls, structural alterations, HVAC and plumbing alterations and a wood stove or fireplace need a building permit [newmarket.ca].
- Finishes, painting, same-size door and window replacement and furnace replacement typically do not, and electrical-only work needs no building permit [newmarket.ca].
When should you apply?
- If the fit-up brings a change of use, for example a hardware store to a restaurant, the Town lists change of use among work that needs a permit [newmarket.ca].
- Construction must seriously commence within six months of issue, or the permit can be revoked [newmarket.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application on the Development Portal [newmarket.ca]
- Floor plans, sections and mechanical drawings as unlocked black-and-white PDFs with the submission date in the title block [newmarket.ca]
- Schedule 1 Designer Information form and Applicable Law Declaration [newmarket.ca]
How do you submit it?
- Apply and track the application on the Town's Development Portal (Accela), with drawings as unlocked black-and-white PDFs and no file-share links, .zip or .jpeg files [newmarket.ca].
- Building Division: building.permits@newmarket.ca, 905-953-5300 ext. 2400 [newmarket.ca].
What are the fees?
2026 fee: $6.32 per m2 for all alterations (Schedule I Building Permit Fees 2026) [newmarket.ca]. A non-refundable minimum application deposit applies: $200 for a construction value of $50,000 or less, $500 for over $50,000 to $500,000, and $1,000 for all others [newmarket.ca].
Forms and guides
- Newmarket Building Permit Fees and Charges, Schedule I 2026 (Town of Newmarket, fee schedule)
Official pages
Track Building Permit: Interior Alteration or Tenant Fit-up (Newmarket) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.