Building Permit: New House, Addition or Additional Residential Unit (Newmarket)
Building permit under the Ontario Building Code for a new house, an addition or an additional residential unit, issued by the Town of Newmarket Building Division [newmarket.ca].
Why is it needed?
- The Town requires a building permit for a new home, an addition, structural alterations, moving or lifting a home, fire damage repairs, finishing a basement and an additional residential unit [newmarket.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
- An accessory dwelling unit must also be registered through the Town's Legislative Services [newmarket.ca].
When should you apply?
- Get a Zoning Preliminary Review before you apply for a new house, an addition or an additional residential unit [newmarket.ca].
- You may apply before closing on the property, but proof of ownership is needed before the permit can be issued [newmarket.ca].
- Construction must seriously commence within six months of issue, or the permit can be revoked [newmarket.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Zoning Preliminary Review with the zoning info sheet for an addition or an additional residential unit, the Applicable Law Declaration, a site plan, floor plans and at least two elevations [newmarket.ca]
- Site plan, floor plans, elevations, sections and mechanical drawings as unlocked black-and-white PDFs with the submission date in the title block [newmarket.ca]
- Schedule 1 Designer Information form [newmarket.ca]
- Energy Efficiency Design Summary (EEDS) for Part 9 residential and the residential HVAC design summary form [newmarket.ca]
- Proof of ownership before the permit is issued [newmarket.ca]
How do you submit it?
- Apply and track the application on the Town's Development Portal (Accela), with drawings as unlocked black-and-white PDFs and no file-share links, .zip or .jpeg files [newmarket.ca].
- Building Division: building.permits@newmarket.ca, 905-953-5300 ext. 2400 [newmarket.ca].
What are the fees?
2026 fee: $21.02 per m2 for residential Part 9 new buildings and additions, and $1,000 per unit for an accessory dwelling unit within existing space (Schedule I Building Permit Fees 2026) [newmarket.ca]. A non-refundable minimum application deposit applies: $200 for a construction value of $50,000 or less, $500 for over $50,000 to $500,000, and $1,000 for all others [newmarket.ca]. Fees are paid when you apply, and development charges are calculated when the permit is issued [newmarket.ca].
Forms and guides
- Newmarket Building Permit Fees and Charges, Schedule I 2026 (Town of Newmarket, fee schedule)
- Newmarket Applicable Law Declaration (Town of Newmarket, application form)
Official pages
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.