Building Permit: Garage, Shed, Deck, Porch or Below-grade Entrance (Newmarket)
Building permit under the Ontario Building Code for a deck, porch, garage, carport, larger detached structure or below-grade entrance at a Newmarket home [newmarket.ca].
Why is it needed?
- A permit is needed for a deck over 10 m2, attached to the home or 600 mm or more above grade, a raised or enclosed porch, a carport or garage, a detached structure over 15 m2 (161 sq ft), and a below-grade entrance or basement walkout [newmarket.ca].
- A standalone building under 15 m2 with no plumbing and an unattached deck under 10 m2 typically need no permit [newmarket.ca].
When should you apply?
- Get a Zoning Preliminary Review before you apply for a deck, shed, pavilion, gazebo or detached garage [newmarket.ca].
- A residential accessory building may be considered for a site plan exemption, since the whole Town is a site plan control area [newmarket.ca].
- After the permit is issued, book the inspections listed on the reviewed plans through inspections@newmarket.ca with two days' notice [newmarket.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Zoning Preliminary Review info sheet for a deck, for a gazebo, pavilion or shed, or for a detached garage [newmarket.ca]
- Applicable Law Declaration, site plan, floor plans and at least two elevations [newmarket.ca]
- Schedule 1 Designer Information form [newmarket.ca]
- Drawings as unlocked black-and-white PDFs with the submission date in the title block [newmarket.ca]
How do you submit it?
- Apply and track the application on the Town's Development Portal (Accela), with drawings as unlocked black-and-white PDFs and no file-share links, .zip or .jpeg files [newmarket.ca].
- Building Division: building.permits@newmarket.ca, 905-953-5300 ext. 2400 [newmarket.ca].
What are the fees?
2026 fee: $300 per dwelling unit for a residential wood deck, $500 for a below-grade entrance, and $21.02 per m2 for residential Part 9 accessory buildings (Schedule I Building Permit Fees 2026) [newmarket.ca]. A non-refundable minimum application deposit applies: $200 for a construction value of $50,000 or less, $500 for over $50,000 to $500,000, and $1,000 for all others [newmarket.ca].
Forms and guides
- Newmarket Building Permit Fees and Charges, Schedule I 2026 (Town of Newmarket, fee schedule)
- Newmarket Applicable Law Declaration (Town of Newmarket, application form)
Official pages
- Building and renovating in Newmarket
- Homeowner's guide to decks
- Building permit fees 2026 (Schedule I)
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.