Permit Library › Other GTA municipalities › City of Mississauga › Building, demolition & signs (Planning and Building)
Temporary Tent Permit, Tents over 60 m2 (CoM)
Building permit for a temporary tent over 60 m2, issued by the Building Division under Building By-law 0236-2024 and the Ontario Building Code.
You need it when: You put up a temporary tent larger than 60 m2 in Mississauga, for example at an event.
Why is it needed?
- Temporary tents over 60 m2 are on the City's list of projects that need a building permit [mississauga.ca].
- Tents are regulated by Division B, Section 3.14 of the Ontario Building Code [ON].
When should you apply?
- Get the permit in ePlans before the tent goes up [mississauga.ca].
- Have the owner's authorization and the manufacturer's framing and anchorage design ready before you apply [mississauga.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Applicable Law Form [mississauga.ca]
- Tent Letter of Use [mississauga.ca]
- Owner authorization [mississauga.ca]
- Manufacturer framing and anchorage design [mississauga.ca]
- Proof the fabric meets CAN/ULC-S109 [mississauga.ca]
- Site plan and floor plan, plus a Commitment to General Review if it applies [mississauga.ca]
How do you submit it?
- Apply online in ePlans, the City's planning and building portal [mississauga.ca].
What are the fees?
2026 fee (Building By-law Schedule B): $227 for each temporary tent [mississauga.ca]. Permanent tents and air-supported structures are $5.64 per m2 [mississauga.ca].
Forms and guides
- Mississauga Building By-law 0236-2024 (City of Mississauga, by-law)
- Mississauga Building By-law Schedule B 2026 Classes of Permits and Fees (City of Mississauga, fee schedule)
- Mississauga Temporary Tents Permit Requirements (City of Mississauga, guide)
- Mississauga Temporary Tent Letter of Use (City of Mississauga, template)
Official pages
Track Temporary Tent Permit, Tents over 60 m2 (CoM) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.