Permit Library › Other GTA municipalities › City of Mississauga › Stormwater, erosion & noise
Storm Sewer Connection Approval (CoM)
Transportation and Works approval under Storm Sewer Use By-law 0046-2022 to connect a private storm drain to the City of Mississauga storm sewer network [mississauga.ca].
You need it when: Work in Mississauga connects a storm drain from a property to the City storm sewer.
Why is it needed?
- Storm drains must be connected to the City's storm sewer network through an approved application [mississauga.ca].
- A residential basement must be 1 metre above the connecting storm sewer or use a sump pump [mississauga.ca].
- Commercial sites need controls that delay flow, such as roof controls, underground storage or lot ponding [mississauga.ca].
When should you apply?
- Get the approved storm connection letter before you apply for the Service Connection Road Occupancy Permit [mississauga.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- PDF site plan stamped by a P.Eng. or OLS [mississauga.ca]
- Pipe diameter, length and slope shown on the plan [mississauga.ca]
- Basement floor elevation and storm sewer elevation shown on the plan [mississauga.ca]
How do you submit it?
- Email the application to Transportation and Works, Environmental Services, at env.approvals@mississauga.ca [mississauga.ca].
- Fees are paid at Permit Administration Services, 3185 Mavis Road, 905-615-4950 [mississauga.ca].
What are the fees?
Fees are set in Schedule B-1, Transportation and Works Fees and Charges [mississauga.ca].
Official pages
Track Storm Sewer Connection Approval (CoM) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.