Permit Library › Other GTA municipalities › City of Mississauga › Roads & right-of-way (Transportation and Works)
Mississauga Road Occupancy Permit: Service Connection
Road occupancy permit for service connection or disconnection work. It can't be used for mainline work or other connection types [MISS].
You need it when: Connecting or disconnecting storm, water, sanitary or secondary hydro services in a Mississauga road allowance.
Why it's needed
- Required before excavating in the road for a service connection [MISS].
When to apply
- After the utility owner approves the connection: storm needs an approval letter from Mississauga Environmental Services; water/sanitary need the Region of Peel C-receipt and Peel-approved drawings; hydro needs Alectra-approved drawings [MISS].
Review time
Plan for about 10 business days. estimate
Documents for a complete application
- Road Occupancy Permit application form (the type that matches the work)
- Construction Certificate of Insurance on the City form: $5M general liability and $5M automobile; no XCU exclusion; pollution liability
- Scalable drawings of the proposed work in the right-of-way
- Traffic control plan (Ontario Traffic Manual Book 7) where lanes or sidewalks are affected
- Storm: approval letter from Environmental Services; water/sanitary: Peel C-receipt and drawings; hydro: Alectra-approved drawings [MISS]
How to submit
- Email the application and documents to Transportation and Works Permit Administration Services: tw.pas@mississauga.ca (905-615-4950) [MISS].
Fees
Based on the type and extent of work under Schedule B-1 (Transportation and Works) of the User Fees and Charges By-law [MISS].
Forms and guides
- Mississauga Road Occupancy Permit General Conditions (City of Mississauga, standard / specification)
- Mississauga Service Connection Permit Application Checklist (City of Mississauga, checklist)
Official pages
Track Mississauga Road Occupancy Permit: Service Connection free.
Track this permit freeDeadlines in business days, email alerts before decisions are due, and your whole team in one place.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.