Permit Library › Other GTA municipalities › City of Mississauga › Building, demolition & signs (Planning and Building)
Backwater Valve Permit (CoM)
Building permit to install a backwater valve under Building By-law 0236-2024, applied for in ePlans under the building permit request type with no drawings needed.
You need it when: You install a backwater valve in a building in Mississauga.
Why is it needed?
- "A building permit is required to install a backwater valve." [mississauga.ca]
- Rebates are offered by the Region of Peel for sanitary valves and by the City for storm valves [mississauga.ca].
When should you apply?
- Get the permit before you install the valve [mississauga.ca].
- Book a plumbing inspection after installation. Once the inspector signs off, the permit status changes to "Completed - All inspections signed off" [mississauga.ca].
How long does review take?
Plan for about 3 business days. City guidance [mississauga.ca]
What documents does a complete application need?
- Building permit request in ePlans [mississauga.ca]
- $50 administrative fee paid when you submit [mississauga.ca]
- No drawings are required [mississauga.ca]
How do you submit it?
- Apply in ePlans under the "building permit" request type [mississauga.ca].
What are the fees?
A $50 administrative fee is required to submit in ePlans [mississauga.ca]. 2026 permit fee (Building By-law Schedule B): $51.50 residential, $256 ICI [mississauga.ca].
Forms and guides
- Mississauga Building By-law 0236-2024 (City of Mississauga, by-law)
- Mississauga Building By-law Schedule B 2026 Classes of Permits and Fees (City of Mississauga, fee schedule)
Official pages
Track Backwater Valve Permit (CoM) free.