Plumbing and Site Services Permit (Markham)
Plumbing Permit (PP) from Markham Building Standards for plumbing in a building or on private property, site servicing and backflow preventers, under Building By-law 2024-206 [markham.ca].
Why is it needed?
- The City's backflow prevention page, under Backflow Prevention By-law 2012-27, says a building permit is required to install, replace or relocate a testable backflow preventer [markham.ca].
- A non-testable preventer, or removal of a testable one, needs no permit, but you must file the Backflow Preventer Removal Form and get City approval before removal [markham.ca].
- Failing to apply for a building permit to install or replace a backflow preventer carries penalties of $250, $375 or $500 (By-law 2024-137) [markham.ca].
When should you apply?
- In the Private Plumbing Rebate Program, submit the Technical Review Application Form to Environment Services first and include the approved copy with the plumbing permit application [markham.ca].
- A City-registered Qualified Person files a Testing and Inspection report for each backflow preventer at installation and every year after [markham.ca].
- The estimated permit fee must be paid in full before plans review begins, and any balance before the permit is issued [markham.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Plumbing Data Form for small, large and complex buildings [markham.ca]
- Plumbing Data Housing Form for interior alterations to existing housing [markham.ca]
- Water Service Pipe Sizing Form for infill residential [markham.ca]
- Site Servicing Declaration for privately serviced low-rise residential [markham.ca]
- Approved Technical Review Application Form, for the Private Plumbing Rebate Program [markham.ca]
How do you submit it?
- Apply online through the ePLAN portal at eplanportal.markham.ca. Paper applications are no longer accepted [markham.ca].
- Building Standards: buildingstandards@markham.ca, 905.475.4858 [markham.ca].
What are the fees?
2026 fees: $250 per lot for a residential service connection (E1), $22.35 per fixture or appliance (E2, E3), $22.35 per metre of water service or building drain and sewer (E7, E8), $344 for the first backflow preventer and $115 for each additional (E6), $573 for a septic-to-sewer conversion (E5) and $151 each for a backwater valve, sump pump or sewage ejector (E13), under By-law 2025-121 [markham.ca]. The minimum permit fee for plumbing fixtures is $250, and these items do not apply to new single, semi-detached or multi-unit buildings under 4 storeys [markham.ca].
Forms and guides
- Markham Building By-law 2024-206 (City of Markham, by-law)
- Markham Backflow Prevention By-law 2012-27 (City of Markham, by-law)
Official pages
- Guide to building permits
- Building permit forms
- Backflow prevention for institutional, commercial and industrial properties
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.