Fire Protection Systems Permit: Sprinklers, Fire Alarm, Standpipe or Mag-locks (Markham)
Building permit from Markham Building Standards for fire protection and life safety systems, priced as stand-alone items in Building Fees By-law 2025-121 [markham.ca].
Why is it needed?
- In non-housing buildings, fire protection and mag-lock work falls under the Alterations (AL) permit for interior work (Building By-law 2024-206) [markham.ca].
- The 2026 fee schedule lists fees for fire alarms, sprinklers, standpipes, emergency power and lighting, and electromagnetic locks [markham.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- The estimated permit fee must be paid in full before plans review begins, and any balance before the permit is issued [markham.ca].
- At inspection, the City uses test certificates such as the Fire Pump Test, Emergency Power Test and Electromagnetic Locking Device Certificates [markham.ca].
- Most buildings also need a fire safety plan, which goes separately to the Markham Fire and Emergency Services Fire Prevention Division [markham.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Fire Pump Test Certificate and Emergency Power Test Certificate [markham.ca]
- Electromagnetic Locking Device Certificate [markham.ca]
- Testing of Integrated Fire Protection and Life Safety Systems Certificate [markham.ca]
How do you submit it?
- Apply online through the ePLAN portal at eplanportal.markham.ca. Paper applications are no longer accepted [markham.ca].
- Building Standards: buildingstandards@markham.ca, 905.475.4858 [markham.ca].
What are the fees?
2026 fees: $488 per storey for a fire alarm system (D2) or an annunciator and control panel (D3), $1.47 per square metre for sprinklers (D4) or in-rack sprinklers (D5), $191 per standpipe riser (D6), $941 for emergency power (D7), $251 per storey for emergency lighting (D8), and $742 for the first electromagnetic lock plus $149 for each additional (A38, B13), under By-law 2025-121 [markham.ca].
Forms and guides
- Markham Building Fees By-law 2025-121 (2026 fees) (City of Markham, fee schedule)
Official pages