Designated Structure Permit: Retaining Wall, Shoring, Tower, Tank or Solar Collectors (Markham)
Building permit from Markham Building Standards for designated structures such as retaining walls, shoring, towers, tanks and solar collectors, with 2026 fees in By-law 2025-121 [markham.ca].
Why is it needed?
- The 2026 fee schedule lists retaining walls, shoring, communication towers, crane runways, exterior storage tanks and pedestrian bridges as permit items [markham.ca].
- Stand-alone solar hot water and solar photovoltaic installations are priced as green energy permit items [markham.ca].
- Designated structures fall under the Ontario Building Code, O. Reg. 163/24 [ON].
When should you apply?
- The estimated permit fee must be paid in full before plans review begins, and any balance before the permit is issued [markham.ca].
- A telecommunication tower may also need a Telecommunication Towers (TEL) application to Planning and Urban Design [markham.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
How do you submit it?
- Apply online through the ePLAN portal at eplanportal.markham.ca. Paper applications are no longer accepted [markham.ca].
- Building Standards: buildingstandards@markham.ca, 905.475.4858 [markham.ca].
What are the fees?
2026 fees: $26.13 per metre of retaining wall (A50), $18.83 per square metre of shoring (A42), $449 for a communication tower (A46), $669 for a crane runway (A47), $449 for an exterior storage tank (A48), $52.19 per metre of pedestrian bridge (A49), and $151 for solar on an individual dwelling or $815 on other buildings (G1 to G4), under By-law 2025-121 [markham.ca].
Forms and guides
- Markham Building Fees By-law 2025-121 (2026 fees) (City of Markham, fee schedule)
Official pages
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.