Building Permit: New House, Addition or Secondary Suite (Markham)
Housing Permit (HP) under Markham Building By-law 2024-206 for a new house, an addition, an interior alteration or an additional residential unit [markham.ca].
Why is it needed?
- The Housing Permit covers detached and semi-detached houses and townhouses under 4 storeys with up to 2 units, including new builds, additions, interior alterations and finished basements [markham.ca].
- Each additional residential unit type has its own City guide and must be registered with Markham Fire and Emergency Services [markham.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- For a new infill home or an addition over 50 m2, submit the Residential Infill Grading and Servicing (RGS) application before the building permit application [markham.ca].
- Final RGS Acceptance and the lot grading deposit are needed before the permit is issued [markham.ca].
- On a designated heritage property or in a heritage conservation district, a building permit cannot be submitted until a Heritage Permit is obtained [markham.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Schedule 1: Designer Information and the Permit Applicant Authorization form [markham.ca]
- Applicable Law Checklist and 2024 OBC Transition Declaration [markham.ca]
- Energy Efficiency Design Summary for housing (SB-12), performance or prescriptive [markham.ca]
- Lot Grading Undertaking and Water Service Pipe Sizing Form for infill residential [markham.ca]
- Tree Assessment and Preservation Plan or Tree Preservation Declaration Form, where trees are affected [markham.ca]
How do you submit it?
- Apply online through ePLAN at eplanportal.markham.ca and follow the ePLAN Submission Standards, because paper applications are no longer accepted [markham.ca].
- Building Standards: buildingstandards@markham.ca, 905.475.4858 [markham.ca].
What are the fees?
2026 fees: $22.08 per m2 for a single detached dwelling, $24.75 per m2 for infill residential and $22.08 per m2 for a secondary suite, with a $151 minimum for Group C residential (By-Law 2025-121) [markham.ca]. Zoning review is $420 for infill residential or $105 for a new single or semi-detached dwelling, and the Pre-Application Review fee is $100 [markham.ca].
Forms and guides
- Markham Building By-law 2024-206 (City of Markham, by-law)
- Markham Building Fees By-law 2025-121 (2026 fees) (City of Markham, fee schedule)
- Markham Building Permit Application Form (2026) (City of Markham, application form)
- Markham Applicable Law Checklist (City of Markham, checklist)
Official pages
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.